9-16-99
Section 9-16-99 Surface mining operations not subject to this article. The provisions of this article shall not apply to any of the following activities: (1) The extraction of coal by a landowner for his own noncommercial use from land owned or leased by him; (2) For surface mining operations affecting two acres or less, the regulatory authority may waive certain requirements of this article where those requirements will not affect the reclamation of the affected lands; (3) The extraction of coal as an incidental part of federal, state or local government-financed highway or other construction under regulations established by the regulatory authority; (4) The extraction of coal incidental to the extraction of other minerals where coal does not exceed sixteen and two-thirds percent of the tonnage of minerals removed for commercial use or sale pursuant to regulations established by the regulatory authority. (Acts 1981, No. 81-435, p. 682, §31; Acts 1983, No. 83-774, p. 1415, §4.)...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-99.htm - 1K - Match Info - Similar pages
9-16-71
Section 9-16-71 Declaration of public policy and legislative intent; all land surface mined under this article shall be reclaimed. (a) The objective of this article is to provide for the safe, responsible and reasonable reclamation of lands upon which surface disturbances will be created by surface mining and the surface effects of underground mining so as to protect the taxable value of property and preserve natural resources within the state and protect and promote the health and safety of the people of this state, consistent with the protection of property and with maximum employment and the economic and industrial well-being of the state. The Legislature finds and declares that the extraction of coal by surface mining provides a major present and future source of energy and is an essential and necessary activity which contributes to the economic and material well-being of the state. (b) The Legislature finds that the unregulated or irresponsible surface mining of coal may cause...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-71.htm - 6K - Match Info - Similar pages
9-16-96
Section 9-16-96 Designation of areas unsuitable for surface coal mining; right to petition; review and public hearing; areas exempt from mining operations. (a)(1) The regulatory authority shall establish a planning process enabling objective decisions based upon competent and scientifically sound data and information as to which, if any, land areas of the state are unsuitable for all or certain types of surface coal mining operations pursuant to the standards set forth in subdivisions (2) and (3) of this subsection but such designation shall not prevent the mineral exploration pursuant to the article of any area so designated. (2) Upon petition pursuant to subsection (c) of this section, the regulatory authority shall designate an area as unsuitable for all or certain types of surface coal mining operations if the regulatory authority determines that reclamation pursuant to the requirements of this article is not technologically and economically feasible. (3) Upon petition pursuant to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-96.htm - 8K - Match Info - Similar pages
9-16-85
Section 9-16-85 Permits - Approval or denial by authority; filing of violation schedule; issuance to mine on prime farm land. (a) Upon the basis of a complete mining application and reclamation plan or a revision or renewal thereof, as required by this article, following public notification and opportunity for a public hearing as required by Section 9-16-88, the regulatory authority shall grant, require modification of, or deny the permit within 30 days and notify the applicant in writing of its action. The applicant for a permit, or revision of a permit, shall have the burden of establishing that his application is in compliance with all the requirements of this article. Within 10 days after the granting of a permit, the regulatory authority shall notify the local governmental officials in the local political subdivision in which the area of land to be affected is located that a permit has been issued and shall describe the location of the land. (b) No permit or revision application...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-85.htm - 6K - Match Info - Similar pages
9-16-90
Section 9-16-90 Environmental protection performance standards. (a) Any permit issued pursuant to this article to conduct surface mining operations shall require that such surface coal mining operations will meet all applicable performance standards of this article, and such other requirements as the regulatory authority shall promulgate. (b) General performance standards shall be applicable to all surface coal mining and reclamation operations and shall require the operation as a minimum to: (1) Conduct surface coal mining operations so as to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future through surface coal mining can be minimized; (2) Restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-90.htm - 30K - Match Info - Similar pages
9-16-91
Section 9-16-91 Surface effects of underground coal mining; requirements; remedies. (a) The regulatory authority shall promulgate rules and regulations directed toward the surface effects of underground coal mining operations, and embodying the following requirements. In adopting any rules and regulations, the regulatory authority shall consider all distinct differences between surface coal mining and underground coal mining. (b) Each permit issued pursuant to this article and relating to underground coal mining shall require the operator to: (1) Adopt measures consistent with available technology in order to prevent subsidence causing material damage to the extent technologically and economically feasible, maximize mine stability, and maintain the value and reasonably foreseeable use of such surface lands, except in those instances where the mining methods used requires planned subsidence in a predictable and controlled manner. Nothing in this subsection shall be construed to prohibit...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-91.htm - 10K - Match Info - Similar pages
9-16-81
Section 9-16-81 Licenses required; application; qualifications; fees. (a) All surface coal mining operations shall be subject to this article, except as excluded in Section 9-16-99. (b) No person shall engage in or carry out on lands within the state any surface coal mining operations unless such person is a citizen of the United States or, if not a citizen of the United States, a person who is legally present in the United States with appropriate documentation from the federal government and has first obtained a license in accordance with this section. The term of a license shall be continuous and shall authorize the licensee, subject to the other provisions of this article, to engage in surface coal mining operations unless the license shall be suspended or revoked in accordance with this article. Suspension, revocation, or subcontracting shall in no way relieve the licensee of his or her obligation to comply with the reclamation requirement of this article. (c) An applicant for a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-81.htm - 6K - Match Info - Similar pages
9-16-83
Section 9-16-83 Permits - Contents of application; reclamation plan; copy of application filed for public inspection; insurance; blasting plan. (a) Each application for a surface coal mining reclamation permit under this article shall be accompanied by a fee as determined by the regulatory authority, but not to exceed the anticipated cost of reviewing, administering, and enforcing the permit. In no event shall the permit fee be less than one thousand dollars ($1,000). The regulatory authority shall develop procedures to enable the cost of the fee to be paid over the life of the mine. The life of the mine means the term of the permit and the time required to successfully complete all surface coal mining and reclamation activities and obtain a full release of the performance bond for each bonded area. (b) The permit application shall be submitted in a format prescribed by and satisfactory to the regulatory authority and shall contain, among other things, all of the following: (1) The...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-83.htm - 13K - Match Info - Similar pages
9-16-89
Section 9-16-89 Performance bonds and bond releases. (a) After a surface coal mining and reclamation permit application has been approved but before such a permit is issued, the applicant shall file with the regulatory authority, on a form prescribed and furnished by the regulatory authority, a bond for performance payable to the state and conditioned upon faithful performance of all the requirements of this article and the permit. The bond shall cover all lands disturbed by the surface coal mining operation and the amount of the initial bond shall be such to cover that area of land within the permit area upon which the operator will initiate and conduct surface coal mining and reclamation operations within the initial term of the permit. As succeeding increments of surface coal mining and reclamation operations are to be initiated and conducted within the permit area, the permittee shall file with the regulatory authority an additional bond or bonds to cover such increments in...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-89.htm - 10K - Match Info - Similar pages
9-16-92
Section 9-16-92 Inspections; authority to inspect records, equipment, premises; etc.; violations; maintenance of records, etc., by permittee; authority to enter upon all lands of the state. (a) For the purpose of developing or assisting in the development, administration, and enforcement of this article or in the administration and enforcement of any permit under this article, or of determining whether any person is in violation of any requirement of this article: (1) The regulatory authority shall require any permittee to (i) establish and maintain appropriate records, (ii) make monthly reports to the regulatory authority, (iii) install, use, and maintain any necessary monitoring equipment or methods, (iv) evaluate results in accordance with such methods, at such locations, intervals, and in such manner as the regulatory authority shall prescribe, and (v) provide such other information relative to surface coal mining and reclamation operations as the regulatory authority deems...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-92.htm - 5K - Match Info - Similar pages
|