9-16-87
Section 9-16-87 Permits - Coal exploration. (a) Coal exploration operations including the removal of coal samples for testing, assaying or other associated non-commercial purposes which substantially disturb the natural land surface may be conducted after filing a notice of intention to explore, including a description of the exploration area, the period of proposed exploration and provisions for reclamation in accordance with Section 9-16-90. (b) Information submitted to the regulatory authority pursuant to this section as confidential concerning trade secrets or privileged commercial or financial information which relates to the competitive rights of the person or entity intended to explore the described area shall not be available for public examination. (c) Any person who conducts any coal exploration activities which substantially disturb the natural land surface in violation of this section or regulations issued pursuant thereto shall be subject to the enforcement provisions of...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-87.htm - 1K - Match Info - Similar pages
9-16-84
Section 9-16-84 Reclamation plans; contents. (a) Each reclamation plan submitted as part of a permit application pursuant to the provisions of this article shall include, in the degree of detail necessary to demonstrate that reclamation required can be accomplished, a statement of: (1) The identification of the lands subject to surface coal mining operations over the estimated life of those operations and the size, sequence, and timing of the sub-areas for which it is anticipated that individual permits for mining will be sought; (2) The condition of the land to be covered by the permit prior to any mining including: a. The uses existing at the time of the application, and if the land has a history of previous mining, the uses which preceded any mining; and b. The capability of the land prior to any mining to support a variety of uses giving consideration to soil and foundation characteristics, topography, and vegetative cover, and, if applicable, a soil survey prepared pursuant to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-84.htm - 5K - Match Info - Similar pages
9-16-96
Section 9-16-96 Designation of areas unsuitable for surface coal mining; right to petition; review and public hearing; areas exempt from mining operations. (a)(1) The regulatory authority shall establish a planning process enabling objective decisions based upon competent and scientifically sound data and information as to which, if any, land areas of the state are unsuitable for all or certain types of surface coal mining operations pursuant to the standards set forth in subdivisions (2) and (3) of this subsection but such designation shall not prevent the mineral exploration pursuant to the article of any area so designated. (2) Upon petition pursuant to subsection (c) of this section, the regulatory authority shall designate an area as unsuitable for all or certain types of surface coal mining operations if the regulatory authority determines that reclamation pursuant to the requirements of this article is not technologically and economically feasible. (3) Upon petition pursuant to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-96.htm - 8K - Match Info - Similar pages
9-16-88
Section 9-16-88 Permits - Review and appeal of applications. (a) At the time of submission of an application for a surface coal mining and reclamation permit, or revision of an existing permit, pursuant to the provisions of this article, the applicant shall submit to the regulatory authority a copy of his advertisement of the ownership, precise location, and boundaries of the land to be affected. At the time of submission such advertisement shall be placed by the applicant in a local newspaper of general circulation in the locality of the proposed surface mine at least once a week for four consecutive weeks. The regulatory authority shall notify various local governmental bodies, planning agencies, and sewage and water treatment authorities or water companies in the locality in which the proposed surface mining will take place, notifying them of the operator's intention to surface mine a particularly described tract of land and indicating the application's permit number and where a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-88.htm - 5K - Match Info - Similar pages
9-16-90
Section 9-16-90 Environmental protection performance standards. (a) Any permit issued pursuant to this article to conduct surface mining operations shall require that such surface coal mining operations will meet all applicable performance standards of this article, and such other requirements as the regulatory authority shall promulgate. (b) General performance standards shall be applicable to all surface coal mining and reclamation operations and shall require the operation as a minimum to: (1) Conduct surface coal mining operations so as to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future through surface coal mining can be minimized; (2) Restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-90.htm - 30K - Match Info - Similar pages
9-16-91
Section 9-16-91 Surface effects of underground coal mining; requirements; remedies. (a) The regulatory authority shall promulgate rules and regulations directed toward the surface effects of underground coal mining operations, and embodying the following requirements. In adopting any rules and regulations, the regulatory authority shall consider all distinct differences between surface coal mining and underground coal mining. (b) Each permit issued pursuant to this article and relating to underground coal mining shall require the operator to: (1) Adopt measures consistent with available technology in order to prevent subsidence causing material damage to the extent technologically and economically feasible, maximize mine stability, and maintain the value and reasonably foreseeable use of such surface lands, except in those instances where the mining methods used requires planned subsidence in a predictable and controlled manner. Nothing in this subsection shall be construed to prohibit...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-91.htm - 10K - Match Info - Similar pages
9-16-99
Section 9-16-99 Surface mining operations not subject to this article. The provisions of this article shall not apply to any of the following activities: (1) The extraction of coal by a landowner for his own noncommercial use from land owned or leased by him; (2) For surface mining operations affecting two acres or less, the regulatory authority may waive certain requirements of this article where those requirements will not affect the reclamation of the affected lands; (3) The extraction of coal as an incidental part of federal, state or local government-financed highway or other construction under regulations established by the regulatory authority; (4) The extraction of coal incidental to the extraction of other minerals where coal does not exceed sixteen and two-thirds percent of the tonnage of minerals removed for commercial use or sale pursuant to regulations established by the regulatory authority. (Acts 1981, No. 81-435, p. 682, §31; Acts 1983, No. 83-774, p. 1415, §4.)...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-99.htm - 1K - Match Info - Similar pages
9-16-81
Section 9-16-81 Licenses required; application; qualifications; fees. (a) All surface coal mining operations shall be subject to this article, except as excluded in Section 9-16-99. (b) No person shall engage in or carry out on lands within the state any surface coal mining operations unless such person is a citizen of the United States or, if not a citizen of the United States, a person who is legally present in the United States with appropriate documentation from the federal government and has first obtained a license in accordance with this section. The term of a license shall be continuous and shall authorize the licensee, subject to the other provisions of this article, to engage in surface coal mining operations unless the license shall be suspended or revoked in accordance with this article. Suspension, revocation, or subcontracting shall in no way relieve the licensee of his or her obligation to comply with the reclamation requirement of this article. (c) An applicant for a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-81.htm - 6K - Match Info - Similar pages
9-16-74
Section 9-16-74 Surface Mining Commission - Powers. In addition to any other powers conferred on it by law, the commission shall have the power to do all of the following: (1) Adopt, amend, suspend, repeal, and enforce reasonably necessary rules and regulations, provided such rules and regulations shall not be more stringent than those promulgated by federal law, or rule or regulation, to control surface coal mining operations consistent with this article including the declaration of public policy and legislative intent contained in Section 9-16-71. Such rules and regulations may be for the state as a whole or may vary from area to area, as may be appropriate to accomplish the policy and intent of this article and in order to take into account varying local conditions. (2) Hold public hearings as may be specified by law relating to any aspect or matter in the administration of this article and, in connection therewith, administer oaths and compel the attendance of witnesses and the...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-74.htm - 8K - Match Info - Similar pages
9-16-82
Section 9-16-82 Permits - Required; term; successor in interest; termination; renewal; application. (a) No person shall engage in surface coal mining operations at a particular location except as a subcontractor of the permittee of that location until such person has been issued a permit by the regulatory authority for that location in accordance with the provisions of this section. The term of a permit shall not exceed five years and shall authorize the permittee to engage in surface coal mining operations within the permitted area, unless sooner suspended or revoked in accordance with the provisions of this article. However, if the applicant demonstrates that a specified longer term is reasonably needed to allow the applicant to obtain the necessary financing for equipment and the opening of the operation and that the application is full and complete for such specified longer term, the regulatory authority may grant a permit for such longer term. A successor in interest of a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-82.htm - 5K - Match Info - Similar pages
|