Code of Alabama

Search for this:
 Search these answers
1 through 10 of 634 similar documents, best matches first.
  Page: 1 2 3 4 5 6 7 8 9 10   next>>

9-16-81
Section 9-16-81 Licenses required; application; qualifications; fees. (a) All surface coal
mining operations shall be subject to this article, except as excluded in Section 9-16-99.
(b) No person shall engage in or carry out on lands within the state any surface coal mining
operations unless such person is a citizen of the United States or, if not a citizen of the
United States, a person who is legally present in the United States with appropriate documentation
from the federal government and has first obtained a license in accordance with this section.
The term of a license shall be continuous and shall authorize the licensee, subject to the
other provisions of this article, to engage in surface coal mining operations unless the license
shall be suspended or revoked in accordance with this article. Suspension, revocation, or
subcontracting shall in no way relieve the licensee of his or her obligation to comply with
the reclamation requirement of this article. (c) An applicant for a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-81.htm - 6K - Match Info - Similar pages

9-16-83
Section 9-16-83 Permits - Contents of application; reclamation plan; copy of application filed
for public inspection; insurance; blasting plan. (a) Each application for a surface coal mining
reclamation permit under this article shall be accompanied by a fee as determined by the regulatory
authority, but not to exceed the anticipated cost of reviewing, administering, and enforcing
the permit. In no event shall the permit fee be less than one thousand dollars ($1,000). The
regulatory authority shall develop procedures to enable the cost of the fee to be paid over
the life of the mine. The life of the mine means the term of the permit and the time required
to successfully complete all surface coal mining and reclamation activities and obtain a full
release of the performance bond for each bonded area. (b) The permit application shall be
submitted in a format prescribed by and satisfactory to the regulatory authority and shall
contain, among other things, all of the following: (1) The...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-83.htm - 13K - Match Info - Similar pages

22-27-2
Section 22-27-2 Definitions. For the purpose of this article, the following terms shall have
the meanings respectively ascribed to them by this section: (1) AGENCY. Any controlling agency,
public or private, elected, appointed, or volunteer utilizing methods approved by the health
department or the department for the purpose of controlling and supervising the collection
or management of solid wastes or recyclable materials. (2) ALTERNATIVE COVER. Material other
than earth used to cover a landfill or sanitary landfill. An alternative cover shall be approved
by the Department of Environmental Management in compliance with federal law and United States
Environmental Protection Agency rules or guidance to achieve a level of performance equal
to or greater than earthen cover material. (3) ASHES. The solid residue from burning of wood,
coal, coke, or other combustible material used for heating, from incineration of solid wastes,
or for the production of electricity at electric generating...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/22-27-2.htm - 14K - Match Info - Similar pages

9-16-90
Section 9-16-90 Environmental protection performance standards. (a) Any permit issued pursuant
to this article to conduct surface mining operations shall require that such surface coal
mining operations will meet all applicable performance standards of this article, and such
other requirements as the regulatory authority shall promulgate. (b) General performance standards
shall be applicable to all surface coal mining and reclamation operations and shall require
the operation as a minimum to: (1) Conduct surface coal mining operations so as to maximize
the utilization and conservation of the solid fuel resource being recovered so that reaffecting
the land in the future through surface coal mining can be minimized; (2) Restore the land
affected to a condition capable of supporting the uses which it was capable of supporting
prior to any mining, or higher or better uses of which there is reasonable likelihood, so
long as such use or uses do not present any actual or probable hazard to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-90.htm - 30K - Match Info - Similar pages

9-16-89
Section 9-16-89 Performance bonds and bond releases. (a) After a surface coal mining and reclamation
permit application has been approved but before such a permit is issued, the applicant shall
file with the regulatory authority, on a form prescribed and furnished by the regulatory authority,
a bond for performance payable to the state and conditioned upon faithful performance of all
the requirements of this article and the permit. The bond shall cover all lands disturbed
by the surface coal mining operation and the amount of the initial bond shall be such to cover
that area of land within the permit area upon which the operator will initiate and conduct
surface coal mining and reclamation operations within the initial term of the permit. As succeeding
increments of surface coal mining and reclamation operations are to be initiated and conducted
within the permit area, the permittee shall file with the regulatory authority an additional
bond or bonds to cover such increments in...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-89.htm - 10K - Match Info - Similar pages

9-16-82
Section 9-16-82 Permits - Required; term; successor in interest; termination; renewal; application.
(a) No person shall engage in surface coal mining operations at a particular location except
as a subcontractor of the permittee of that location until such person has been issued a permit
by the regulatory authority for that location in accordance with the provisions of this section.
The term of a permit shall not exceed five years and shall authorize the permittee to engage
in surface coal mining operations within the permitted area, unless sooner suspended or revoked
in accordance with the provisions of this article. However, if the applicant demonstrates
that a specified longer term is reasonably needed to allow the applicant to obtain the necessary
financing for equipment and the opening of the operation and that the application is full
and complete for such specified longer term, the regulatory authority may grant a permit for
such longer term. A successor in interest of a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-82.htm - 5K - Match Info - Similar pages

9-16-91
Section 9-16-91 Surface effects of underground coal mining; requirements; remedies. (a) The
regulatory authority shall promulgate rules and regulations directed toward the surface effects
of underground coal mining operations, and embodying the following requirements. In adopting
any rules and regulations, the regulatory authority shall consider all distinct differences
between surface coal mining and underground coal mining. (b) Each permit issued pursuant to
this article and relating to underground coal mining shall require the operator to: (1) Adopt
measures consistent with available technology in order to prevent subsidence causing material
damage to the extent technologically and economically feasible, maximize mine stability, and
maintain the value and reasonably foreseeable use of such surface lands, except in those instances
where the mining methods used requires planned subsidence in a predictable and controlled
manner. Nothing in this subsection shall be construed to prohibit...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-91.htm - 10K - Match Info - Similar pages

9-16-84
Section 9-16-84 Reclamation plans; contents. (a) Each reclamation plan submitted as part of
a permit application pursuant to the provisions of this article shall include, in the degree
of detail necessary to demonstrate that reclamation required can be accomplished, a statement
of: (1) The identification of the lands subject to surface coal mining operations over the
estimated life of those operations and the size, sequence, and timing of the sub-areas for
which it is anticipated that individual permits for mining will be sought; (2) The condition
of the land to be covered by the permit prior to any mining including: a. The uses existing
at the time of the application, and if the land has a history of previous mining, the uses
which preceded any mining; and b. The capability of the land prior to any mining to support
a variety of uses giving consideration to soil and foundation characteristics, topography,
and vegetative cover, and, if applicable, a soil survey prepared pursuant to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-84.htm - 5K - Match Info - Similar pages

9-16-71
Section 9-16-71 Declaration of public policy and legislative intent; all land surface mined
under this article shall be reclaimed. (a) The objective of this article is to provide for
the safe, responsible and reasonable reclamation of lands upon which surface disturbances
will be created by surface mining and the surface effects of underground mining so as to protect
the taxable value of property and preserve natural resources within the state and protect
and promote the health and safety of the people of this state, consistent with the protection
of property and with maximum employment and the economic and industrial well-being of the
state. The Legislature finds and declares that the extraction of coal by surface mining provides
a major present and future source of energy and is an essential and necessary activity which
contributes to the economic and material well-being of the state. (b) The Legislature finds
that the unregulated or irresponsible surface mining of coal may cause...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-71.htm - 6K - Match Info - Similar pages

9-16-74
Section 9-16-74 Surface Mining Commission - Powers. In addition to any other powers conferred
on it by law, the commission shall have the power to do all of the following: (1) Adopt, amend,
suspend, repeal, and enforce reasonably necessary rules and regulations, provided such rules
and regulations shall not be more stringent than those promulgated by federal law, or rule
or regulation, to control surface coal mining operations consistent with this article including
the declaration of public policy and legislative intent contained in Section 9-16-71. Such
rules and regulations may be for the state as a whole or may vary from area to area, as may
be appropriate to accomplish the policy and intent of this article and in order to take into
account varying local conditions. (2) Hold public hearings as may be specified by law relating
to any aspect or matter in the administration of this article and, in connection therewith,
administer oaths and compel the attendance of witnesses and the...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-74.htm - 8K - Match Info - Similar pages

1 through 10 of 634 similar documents, best matches first.
  Page: 1 2 3 4 5 6 7 8 9 10   next>>