9-16-88
Section 9-16-88 Permits - Review and appeal of applications. (a) At the time of submission of an application for a surface coal mining and reclamation permit, or revision of an existing permit, pursuant to the provisions of this article, the applicant shall submit to the regulatory authority a copy of his advertisement of the ownership, precise location, and boundaries of the land to be affected. At the time of submission such advertisement shall be placed by the applicant in a local newspaper of general circulation in the locality of the proposed surface mine at least once a week for four consecutive weeks. The regulatory authority shall notify various local governmental bodies, planning agencies, and sewage and water treatment authorities or water companies in the locality in which the proposed surface mining will take place, notifying them of the operator's intention to surface mine a particularly described tract of land and indicating the application's permit number and where a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-88.htm - 5K - Match Info - Similar pages
22-22A-5
Section 22-22A-5 Powers and functions of department; representation of department by Attorney General in legal actions. In addition to any other powers and functions which may be conferred upon it by law, the department is authorized beginning October 1, 1982 to: (1) Administer appropriate portions of Sections 9-7-10 through 9-7-20, which relate to permitting, regulatory and enforcement functions; administer and enforce the provisions and execute the functions of Chapter 28 of this title; Chapter 22 of this title; Article 2 of Chapter 23 of this title; Chapter 30 of this title; appropriate portions of Article 1 of Chapter 27 of this title; Sections 22-24-1 through 22-24-11; Sections 22-25-1 through 22-25-15; and Sections 22-36-1 through 22-36-10. (2) Acting through the Environmental Management Commission, promulgate rules, regulations, and standards in order to carry out the provisions and intent of this chapter; provided, however, that prior to the promulgation of any state primary or...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/22-22A-5.htm - 16K - Match Info - Similar pages
9-16-4
Section 9-16-4 Permit for engaging in surface mining operations - Required; exemptions; applicability. (a) No operator shall engage in any surface mining, as defined in this article, after October 1, 1970, without a valid permit from the department to engage in the surface mining. A separate permit shall be required for each such surface mining operation that is not contiguous to a surface mining operation for which the operator has a valid permit. (b) Notwithstanding anything to the contrary, this chapter shall not apply to surface mining to extract materials for the use and benefit of the owner of the property being mined or of an interest therein, the lessee of the property or a charitable institution or organization or governmental entity and not for commercial sale. This exemption shall apply to all mining operations which meet the requirements set forth in this section, including those mining operations for which permits had been issued prior to October 1, 1997. Any permits for...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-4.htm - 3K - Match Info - Similar pages
9-16-6
Section 9-16-6 Permit for engaging in surface mining operations - Amendments. (a) An operator desiring to amend a permit issued to him to include additional land may file an amended application with the department. Upon receipt of the amended application, such increase in the bond or surety as may be required under the provisions of this article and payment of a $50.00 fee, the department shall issue an amendment to the original permit covering the additional land described in the amended application for the period of time remaining in the original permit. (b) An operator desiring to amend a permit issued to him to withdraw land covered by such permit may file an amended application with the department. Upon receipt of the amended application and upon verification by inspection that the land to be withdrawn is not affected land resulting from surface mining of the applicant, the department shall proportionately reduce the bond or the security filed by the applicant pursuant to the...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-6.htm - 1K - Match Info - Similar pages
9-16-7
Section 9-16-7 Duties of operators. (a) Every operator to whom a permit is issued pursuant to this article and who engages in surface mining on lands described in the permit shall: (1) Submit to the department, no later than 90 days after expiration of the permit period, a map or aerial photograph showing the location of the surface mining operation conducted during the permit period by section, township, range, and county with other description to identify the land upon which the operator has conducted surface mining during the permit period. The map or aerial photograph shall include a legend showing the number of acres of affected land and the reclamation to be made in accordance with this section. (2) Commence contemporaneous reclamation of mined areas as set out in the comprehensive reclamation plan approved by the department. Reclamation bonds shall be adjusted annually to reflect unreclaimed disturbed acreage as well as reclaimed acreage released by the department. Failure to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-7.htm - 5K - Match Info - Similar pages
9-16-11
Section 9-16-11 Enforcement of provisions of article - Institution of civil action for enforcement of final order of director; engaging in surface mining without valid permit; willful misrepresentations, etc., in applications; rights of exception and appeal. (a) Should the director determine that any final order or determination made by him, not then the subject of judicial review, is being violated by any operator, then the director may cause to have instituted a civil action in any court of competent jurisdiction to forfeit the bond of the operator as to land affected by the operator's violation of this article or for injunctive or other appropriate relief to prevent any further or continued violation of such final order or determination. (b) Any person required by this article to have a permit who engages in surface mining without a valid permit to do so as prescribed by this article shall be deemed guilty of a violation of this article and, upon complaint made by the director in a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-11.htm - 1K - Match Info - Similar pages
9-17-24
Section 9-17-24 Notification requirement; hearing; fees; Alabama Oil and Gas Board Special Fund. (a) Any person desiring or proposing to drill any well in search of oil or gas or any person proposing to drill a Class II injection well as defined in the Federal Safe Drinking Water Act, 42 U.S.C. ยง 300f et seq., before commencing the drilling of any such well, shall notify the State Oil and Gas Supervisor upon the form as the State Oil and Gas Supervisor may prescribe and shall pay to the State Treasurer a fee of three hundred dollars ($300) for each well. The drilling of any well is hereby prohibited until notice is given and the fee has been paid as herein provided. The State Oil and Gas Supervisor shall have the power and authority to prescribe that the form indicate the exact location of the well, the name and address of the owner, operator, contractor, driller, and any other person responsible for the conduct of drilling operations, the proposed depth of the well, the elevation of...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-17-24.htm - 5K - Match Info - Similar pages
25-9-84
Section 25-9-84 Coursing of air. (a) Two available openings to the surface are required from each seam or stratum of coal worked. In drift or slope mines, such openings provided after August 12, 1949, must be separated by not less than 40 feet of natural strata, and all crosscuts between them shall be closed with stoppings of fireproof material. In shaft mines, such openings provided after August 12, 1949, must be separated by not less than 200 feet of natural strata. The second opening may be made through an adjoining mine. Until these provisions are met, not over five men in a drift, 10 men in a slope, and 20 men in a shaft shall work in the mine at one time, and no additional development shall be permitted until the connection is made to the second opening. In mines wherein final pillar robbing operations necessitate closing the second opening, the above limitations as to the number of men permitted to work will apply until the mine is worked out and abandoned. (b) Both openings...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/25-9-84.htm - 6K - Match Info - Similar pages
23-1-352
Section 23-1-352 Definitions. For the purpose of the laws of this state relating to aeronautics, the following words, terms, and phrases shall have the meanings herein given, unless otherwise specifically defined, or unless another intention clearly appears or the context requires otherwise: (1) AERONAUTICS or AERONAUTICAL ACTIVITIES. The science and art of flight including, but not limited to, transportation by aircraft; the operation, construction, repair, or maintenance of aircraft, aircraft power plants and accessories, including the use, repair, packing, and maintenance of parachutes; the design, establishment, construction, expansion, operation, improvement, repair, or maintenance of airports, restricted landing areas, or other air navigation facilities including the aerial and ground approaches thereto; and instruction in flying or ground subjects pertaining thereto. (2) AERONAUTICAL INSTRUCTION. The imparting of aeronautical knowledge or information by any aeronautics...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/23-1-352.htm - 10K - Match Info - Similar pages
9-17-13
Section 9-17-13 Integration of interests; cycling operations; orders of board; procedures. (a) When any mineral or other related interests deriving from two or more separately owned tracts of land are embraced within an established or a proposed drilling or production unit, or when there are separately owned interests in all or a part of an established or proposed drilling or production unit, or any combination of such, the persons owning the interests therein may validly agree to integrate or pool the interests and to develop the interests and associated lands as a drilling or production unit. Where, however, the owners have not agreed to so integrate or pool the interests, the board shall, for the prevention of waste or to avoid the drilling of unnecessary wells, require the persons owning such interests to do so and to develop their interests and the associated lands as a drilling or production unit. (b) The board, in order to prevent waste and avoid the drilling of unnecessary...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-17-13.htm - 15K - Match Info - Similar pages
|