9-16-4
Section 9-16-4 Permit for engaging in surface mining operations - Required; exemptions; applicability.
(a) No operator shall engage in any surface mining, as defined in this article, after October
1, 1970, without a valid permit from the department to engage in the surface mining. A separate
permit shall be required for each such surface mining operation that is not contiguous to
a surface mining operation for which the operator has a valid permit. (b) Notwithstanding
anything to the contrary, this chapter shall not apply to surface mining to extract materials
for the use and benefit of the owner of the property being mined or of an interest therein,
the lessee of the property or a charitable institution or organization or governmental entity
and not for commercial sale. This exemption shall apply to all mining operations which meet
the requirements set forth in this section, including those mining operations for which permits
had been issued prior to October 1, 1997. Any permits for...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-4.htm - 3K - Match Info - Similar pages

9-16-85
Section 9-16-85 Permits - Approval or denial by authority; filing of violation schedule; issuance
to mine on prime farm land. (a) Upon the basis of a complete mining application and reclamation
plan or a revision or renewal thereof, as required by this article, following public notification
and opportunity for a public hearing as required by Section 9-16-88, the regulatory authority
shall grant, require modification of, or deny the permit within 30 days and notify the applicant
in writing of its action. The applicant for a permit, or revision of a permit, shall have
the burden of establishing that his application is in compliance with all the requirements
of this article. Within 10 days after the granting of a permit, the regulatory authority shall
notify the local governmental officials in the local political subdivision in which the area
of land to be affected is located that a permit has been issued and shall describe the location
of the land. (b) No permit or revision application...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-85.htm - 6K - Match Info - Similar pages

22-22A-5
Section 22-22A-5 Powers and functions of department; representation of department by Attorney
General in legal actions. In addition to any other powers and functions which may be conferred
upon it by law, the department is authorized beginning October 1, 1982 to: (1) Administer
appropriate portions of Sections 9-7-10 through 9-7-20, which relate to permitting, regulatory
and enforcement functions; administer and enforce the provisions and execute the functions
of Chapter 28 of this title; Chapter 22 of this title; Article 2 of Chapter 23 of this title;
Chapter 30 of this title; appropriate portions of Article 1 of Chapter 27 of this title; Sections
22-24-1 through 22-24-11; Sections 22-25-1 through 22-25-15; and Sections 22-36-1 through
22-36-10. (2) Acting through the Environmental Management Commission, promulgate rules, regulations,
and standards in order to carry out the provisions and intent of this chapter; provided, however,
that prior to the promulgation of any state primary or...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/22-22A-5.htm - 16K - Match Info - Similar pages

9-16-5
Section 9-16-5 Permit for engaging in surface mining operations - Application; issuance. (a)
Any operator desiring a permit shall file an application with the department upon a form furnished
by the department containing all of the following: (1) A brief description of the tract or
tracts of land and the estimated number of acres to be affected by the applicant's surface
mining thereon during the permit period. The description shall include the section, township,
range, and county in which the land is located and shall otherwise describe the land with
sufficient clarity so it may be located and distinguished from other lands. The description
shall also include a description of access to the area from the nearest public highway (2)
A statement by the applicant that the applicant has the right and power by legal estate owned
to mine by surface mining the land so described. The statement shall set forth by reference
the source of the applicant's right and power to so mine. (3) A statement...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-5.htm - 3K - Match Info - Similar pages

9-16-90
Section 9-16-90 Environmental protection performance standards. (a) Any permit issued pursuant
to this article to conduct surface mining operations shall require that such surface coal
mining operations will meet all applicable performance standards of this article, and such
other requirements as the regulatory authority shall promulgate. (b) General performance standards
shall be applicable to all surface coal mining and reclamation operations and shall require
the operation as a minimum to: (1) Conduct surface coal mining operations so as to maximize
the utilization and conservation of the solid fuel resource being recovered so that reaffecting
the land in the future through surface coal mining can be minimized; (2) Restore the land
affected to a condition capable of supporting the uses which it was capable of supporting
prior to any mining, or higher or better uses of which there is reasonable likelihood, so
long as such use or uses do not present any actual or probable hazard to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-90.htm - 30K - Match Info - Similar pages

9-16-82
Section 9-16-82 Permits - Required; term; successor in interest; termination; renewal; application.
(a) No person shall engage in surface coal mining operations at a particular location except
as a subcontractor of the permittee of that location until such person has been issued a permit
by the regulatory authority for that location in accordance with the provisions of this section.
The term of a permit shall not exceed five years and shall authorize the permittee to engage
in surface coal mining operations within the permitted area, unless sooner suspended or revoked
in accordance with the provisions of this article. However, if the applicant demonstrates
that a specified longer term is reasonably needed to allow the applicant to obtain the necessary
financing for equipment and the opening of the operation and that the application is full
and complete for such specified longer term, the regulatory authority may grant a permit for
such longer term. A successor in interest of a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-82.htm - 5K - Match Info - Similar pages

9-16-83
Section 9-16-83 Permits - Contents of application; reclamation plan; copy of application filed
for public inspection; insurance; blasting plan. (a) Each application for a surface coal mining
reclamation permit under this article shall be accompanied by a fee as determined by the regulatory
authority, but not to exceed the anticipated cost of reviewing, administering, and enforcing
the permit. In no event shall the permit fee be less than one thousand dollars ($1,000). The
regulatory authority shall develop procedures to enable the cost of the fee to be paid over
the life of the mine. The life of the mine means the term of the permit and the time required
to successfully complete all surface coal mining and reclamation activities and obtain a full
release of the performance bond for each bonded area. (b) The permit application shall be
submitted in a format prescribed by and satisfactory to the regulatory authority and shall
contain, among other things, all of the following: (1) The...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-83.htm - 13K - Match Info - Similar pages

9-16-2
Section 9-16-2 Definitions. Unless clearly indicated otherwise by the context, as used in this
article, the following terms have the following meanings: (1) AFFECTED LAND. The area of land
from which overburden has been removed or upon which overburden has been deposited after October
1, 1970. (2) CONTEMPORANEOUS. Occurring at the same time as a surface mining operation and
in conjunction with the grading activities at the site. (3) CONTIGUOUS. In actual contact,
touching, as contrasted with being near but not in contact. (4) DEPARTMENT. The Department
of Industrial Relations of the State of Alabama or any department, bureau, or commission as
may lawfully succeed to the powers and duties of the department relating to mining operations.
(5) DIRECT SEEDING. The planting of seeds by hand sowing, machine sowing, or aerial seeding.
(6) DIRECTOR. Director of the department or officer, bureau, or commission as may lawfully
succeed to the powers and duties of the director. (7) HIGHWALL. The...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-2.htm - 3K - Match Info - Similar pages

9-16-96
Section 9-16-96 Designation of areas unsuitable for surface coal mining; right to petition;
review and public hearing; areas exempt from mining operations. (a)(1) The regulatory authority
shall establish a planning process enabling objective decisions based upon competent and scientifically
sound data and information as to which, if any, land areas of the state are unsuitable for
all or certain types of surface coal mining operations pursuant to the standards set forth
in subdivisions (2) and (3) of this subsection but such designation shall not prevent the
mineral exploration pursuant to the article of any area so designated. (2) Upon petition pursuant
to subsection (c) of this section, the regulatory authority shall designate an area as unsuitable
for all or certain types of surface coal mining operations if the regulatory authority determines
that reclamation pursuant to the requirements of this article is not technologically and economically
feasible. (3) Upon petition pursuant to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-96.htm - 8K - Match Info - Similar pages

9-16-91
Section 9-16-91 Surface effects of underground coal mining; requirements; remedies. (a) The
regulatory authority shall promulgate rules and regulations directed toward the surface effects
of underground coal mining operations, and embodying the following requirements. In adopting
any rules and regulations, the regulatory authority shall consider all distinct differences
between surface coal mining and underground coal mining. (b) Each permit issued pursuant to
this article and relating to underground coal mining shall require the operator to: (1) Adopt
measures consistent with available technology in order to prevent subsidence causing material
damage to the extent technologically and economically feasible, maximize mine stability, and
maintain the value and reasonably foreseeable use of such surface lands, except in those instances
where the mining methods used requires planned subsidence in a predictable and controlled
manner. Nothing in this subsection shall be construed to prohibit...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-91.htm - 10K - Match Info - Similar pages