Code of Alabama

Search for this:
 Search these answers
1 through 10 of 468 similar documents, best matches first.
  Page: 1 2 3 4 5 6 7 8 9 10   next>>

25-9-270
Section 25-9-270 Applicability of provisions. All other provisions of this chapter, except
those obviously peculiar to underground operations and also those specifically provided for
in this article, are applicable to surface mining operations. All provisions contained in
this article applicable to surface operations of underground coal mines and not specifically
covered elsewhere in this chapter apply to all coal mines. (Acts 1949, No. 207, p. 242, §72;
Acts 1975, 4th Ex. Sess., No. 147, p. 2866, §1.)...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/25-9-270.htm - 820 bytes - Match Info - Similar pages

9-16-91
Section 9-16-91 Surface effects of underground coal mining; requirements; remedies. (a) The
regulatory authority shall promulgate rules and regulations directed toward the surface effects
of underground coal mining operations, and embodying the following requirements. In adopting
any rules and regulations, the regulatory authority shall consider all distinct differences
between surface coal mining and underground coal mining. (b) Each permit issued pursuant to
this article and relating to underground coal mining shall require the operator to: (1) Adopt
measures consistent with available technology in order to prevent subsidence causing material
damage to the extent technologically and economically feasible, maximize mine stability, and
maintain the value and reasonably foreseeable use of such surface lands, except in those instances
where the mining methods used requires planned subsidence in a predictable and controlled
manner. Nothing in this subsection shall be construed to prohibit...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-91.htm - 10K - Match Info - Similar pages

9-16-90
Section 9-16-90 Environmental protection performance standards. (a) Any permit issued pursuant
to this article to conduct surface mining operations shall require that such surface coal
mining operations will meet all applicable performance standards of this article, and such
other requirements as the regulatory authority shall promulgate. (b) General performance standards
shall be applicable to all surface coal mining and reclamation operations and shall require
the operation as a minimum to: (1) Conduct surface coal mining operations so as to maximize
the utilization and conservation of the solid fuel resource being recovered so that reaffecting
the land in the future through surface coal mining can be minimized; (2) Restore the land
affected to a condition capable of supporting the uses which it was capable of supporting
prior to any mining, or higher or better uses of which there is reasonable likelihood, so
long as such use or uses do not present any actual or probable hazard to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-90.htm - 30K - Match Info - Similar pages

9-16-83
Section 9-16-83 Permits - Contents of application; reclamation plan; copy of application filed
for public inspection; insurance; blasting plan. (a) Each application for a surface coal mining
reclamation permit under this article shall be accompanied by a fee as determined by the regulatory
authority, but not to exceed the anticipated cost of reviewing, administering, and enforcing
the permit. In no event shall the permit fee be less than one thousand dollars ($1,000). The
regulatory authority shall develop procedures to enable the cost of the fee to be paid over
the life of the mine. The life of the mine means the term of the permit and the time required
to successfully complete all surface coal mining and reclamation activities and obtain a full
release of the performance bond for each bonded area. (b) The permit application shall be
submitted in a format prescribed by and satisfactory to the regulatory authority and shall
contain, among other things, all of the following: (1) The...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-83.htm - 13K - Match Info - Similar pages

9-16-74
Section 9-16-74 Surface Mining Commission - Powers. In addition to any other powers conferred
on it by law, the commission shall have the power to do all of the following: (1) Adopt, amend,
suspend, repeal, and enforce reasonably necessary rules and regulations, provided such rules
and regulations shall not be more stringent than those promulgated by federal law, or rule
or regulation, to control surface coal mining operations consistent with this article including
the declaration of public policy and legislative intent contained in Section 9-16-71. Such
rules and regulations may be for the state as a whole or may vary from area to area, as may
be appropriate to accomplish the policy and intent of this article and in order to take into
account varying local conditions. (2) Hold public hearings as may be specified by law relating
to any aspect or matter in the administration of this article and, in connection therewith,
administer oaths and compel the attendance of witnesses and the...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-74.htm - 8K - Match Info - Similar pages

9-16-71
Section 9-16-71 Declaration of public policy and legislative intent; all land surface mined
under this article shall be reclaimed. (a) The objective of this article is to provide for
the safe, responsible and reasonable reclamation of lands upon which surface disturbances
will be created by surface mining and the surface effects of underground mining so as to protect
the taxable value of property and preserve natural resources within the state and protect
and promote the health and safety of the people of this state, consistent with the protection
of property and with maximum employment and the economic and industrial well-being of the
state. The Legislature finds and declares that the extraction of coal by surface mining provides
a major present and future source of energy and is an essential and necessary activity which
contributes to the economic and material well-being of the state. (b) The Legislature finds
that the unregulated or irresponsible surface mining of coal may cause...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-71.htm - 6K - Match Info - Similar pages

9-16-82
Section 9-16-82 Permits - Required; term; successor in interest; termination; renewal; application.
(a) No person shall engage in surface coal mining operations at a particular location except
as a subcontractor of the permittee of that location until such person has been issued a permit
by the regulatory authority for that location in accordance with the provisions of this section.
The term of a permit shall not exceed five years and shall authorize the permittee to engage
in surface coal mining operations within the permitted area, unless sooner suspended or revoked
in accordance with the provisions of this article. However, if the applicant demonstrates
that a specified longer term is reasonably needed to allow the applicant to obtain the necessary
financing for equipment and the opening of the operation and that the application is full
and complete for such specified longer term, the regulatory authority may grant a permit for
such longer term. A successor in interest of a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-82.htm - 5K - Match Info - Similar pages

9-16-73
Section 9-16-73 Surface Mining Commission - Creation; composition; officers; compensation;
meetings; offices; funds; removal of members. (a) There is continued as previously established
the Alabama Surface Mining Reclamation Commission under the name of the Alabama Surface Mining
Commission for the purpose of transition in implementing and enforcing this article and carrying
out the intent and policy stated in Section 9-16-71. All members of the commission appointed
under authority of Section 9-16-33, shall continue their terms as created under that section
until all reappointments and filling of vacancies have been filled in the manner as provided
in this section. At the expiration of any term, that member shall continue in office until
an appointment occurs as provided in this section. After February 25, 1994, no member shall
serve more than two full consecutive terms of office. (b) The commission shall be composed
of seven members, who are fair and reasonable citizens of the state...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-73.htm - 8K - Match Info - Similar pages

9-17-152
Section 9-17-152 Board approval; recordation of order; certificate of effectiveness; dissolution
of fields and units; determination of commercial reserves; creation of cavities. (a) The use
of an underground reservoir as a storage facility for gas is hereby authorized, provided that
the board shall first enter an order, after notice and hearing pursuant to the provisions
of Sections 9-17-3 to 9-17-8, inclusive, approving such proposed underground storage of gas
and designating the horizontal and vertical boundaries of the storage facility, such boundaries
to include within them any necessary or reasonable buffer zone for the purpose of insuring
the safe operation of the storage facility and to protect the storage facility against pollution,
invasion, and escape or migration of gas therefrom, upon finding as follows: (1) That the
storage facility is suitable and feasible for the injection, storage and withdrawal of gas
and has a greater value or utility for the storage of gas than for...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-17-152.htm - 5K - Match Info - Similar pages

9-16-81
Section 9-16-81 Licenses required; application; qualifications; fees. (a) All surface coal
mining operations shall be subject to this article, except as excluded in Section 9-16-99.
(b) No person shall engage in or carry out on lands within the state any surface coal mining
operations unless such person is a citizen of the United States or, if not a citizen of the
United States, a person who is legally present in the United States with appropriate documentation
from the federal government and has first obtained a license in accordance with this section.
The term of a license shall be continuous and shall authorize the licensee, subject to the
other provisions of this article, to engage in surface coal mining operations unless the license
shall be suspended or revoked in accordance with this article. Suspension, revocation, or
subcontracting shall in no way relieve the licensee of his or her obligation to comply with
the reclamation requirement of this article. (c) An applicant for a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-81.htm - 6K - Match Info - Similar pages

1 through 10 of 468 similar documents, best matches first.
  Page: 1 2 3 4 5 6 7 8 9 10   next>>