9-16-90
Section 9-16-90 Environmental protection performance standards. (a) Any permit issued
pursuant to this article to conduct surface mining operations shall require that such surface
coal mining operations will meet all applicable performance standards of this article, and
such other requirements as the regulatory authority shall promulgate. (b) General performance
standards shall be applicable to all surface coal mining and reclamation operations and shall
require the operation as a minimum to: (1) Conduct surface coal mining operations so as to
maximize the utilization and conservation of the solid fuel resource being recovered so that
reaffecting the land in the future through surface coal mining can be minimized; (2) Restore
the land affected to a condition capable of supporting the uses which it was capable of supporting
prior to any mining, or higher or better uses of which there is reasonable likelihood, so
long as such use or uses do not present any actual or probable hazard to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-90.htm - 30K - Match Info - Similar pages

9-16-91
Section 9-16-91 Surface effects of underground coal mining; requirements; remedies.
(a) The regulatory authority shall promulgate rules and regulations directed toward the surface
effects of underground coal mining operations, and embodying the following requirements. In
adopting any rules and regulations, the regulatory authority shall consider all distinct differences
between surface coal mining and underground coal mining. (b) Each permit issued pursuant to
this article and relating to underground coal mining shall require the operator to: (1) Adopt
measures consistent with available technology in order to prevent subsidence causing material
damage to the extent technologically and economically feasible, maximize mine stability, and
maintain the value and reasonably foreseeable use of such surface lands, except in those instances
where the mining methods used requires planned subsidence in a predictable and controlled
manner. Nothing in this subsection shall be construed to prohibit...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-91.htm - 10K - Match Info - Similar pages

9-16-81
Section 9-16-81 Licenses required; application; qualifications; fees. (a) All surface
coal mining operations shall be subject to this article, except as excluded in Section
9-16-99. (b) No person shall engage in or carry out on lands within the state any surface
coal mining operations unless such person is a citizen of the United States or, if not a citizen
of the United States, a person who is legally present in the United States with appropriate
documentation from the federal government and has first obtained a license in accordance with
this section. The term of a license shall be continuous and shall authorize the licensee,
subject to the other provisions of this article, to engage in surface coal mining operations
unless the license shall be suspended or revoked in accordance with this article. Suspension,
revocation, or subcontracting shall in no way relieve the licensee of his or her obligation
to comply with the reclamation requirement of this article. (c) An applicant for a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-81.htm - 6K - Match Info - Similar pages

9-16-74
Section 9-16-74 Surface Mining Commission - Powers. In addition to any other powers
conferred on it by law, the commission shall have the power to do all of the following: (1)
Adopt, amend, suspend, repeal, and enforce reasonably necessary rules and regulations, provided
such rules and regulations shall not be more stringent than those promulgated by federal law,
or rule or regulation, to control surface coal mining operations consistent with this article
including the declaration of public policy and legislative intent contained in Section
9-16-71. Such rules and regulations may be for the state as a whole or may vary from area
to area, as may be appropriate to accomplish the policy and intent of this article and in
order to take into account varying local conditions. (2) Hold public hearings as may be specified
by law relating to any aspect or matter in the administration of this article and, in connection
therewith, administer oaths and compel the attendance of witnesses and the...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-74.htm - 8K - Match Info - Similar pages

9-16-79
Section 9-16-79 Hearings and appeals procedure. Procedures for hearings and appeals
under this article shall be made as herein provided and in accordance with such general rules
and regulations as the regulatory authority may prescribe. These procedures shall take precedence
over the Alabama Administrative Procedure Act, which shall in no respect apply to proceedings
arising under this article. (1)a. A determination by the regulatory authority as specified
by law shall be made promptly and shall include a statement as to the action to be taken and
reasons therefor. Notice of the determination or decision shall be promptly given to the parties
involved by delivery or by mailing such notices to their last known addresses. When the regulatory
authority gives a notice of determination, unless an appeal is filed by any person having
an interest which may be adversely affected with the chief hearing officer within 30 days
of such notice such determination shall be deemed final and not...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-79.htm - 11K - Match Info - Similar pages

9-16-89
Section 9-16-89 Performance bonds and bond releases. (a) After a surface coal mining
and reclamation permit application has been approved but before such a permit is issued, the
applicant shall file with the regulatory authority, on a form prescribed and furnished by
the regulatory authority, a bond for performance payable to the state and conditioned upon
faithful performance of all the requirements of this article and the permit. The bond shall
cover all lands disturbed by the surface coal mining operation and the amount of the initial
bond shall be such to cover that area of land within the permit area upon which the operator
will initiate and conduct surface coal mining and reclamation operations within the initial
term of the permit. As succeeding increments of surface coal mining and reclamation operations
are to be initiated and conducted within the permit area, the permittee shall file with the
regulatory authority an additional bond or bonds to cover such increments in...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-89.htm - 10K - Match Info - Similar pages

9-16-93
Section 9-16-93 Violations; inspection by authority; remedial actions; hearing; action
by Attorney General. (a) Whenever, on the basis of any information available to it, including
receipt of information from any person, the regulatory authority has reason to believe that
any person is in violation of any requirement of this article or any permit condition required
by this article, the regulatory authority shall immediately order an inspection of the surface
coal mining operation at which the alleged violation is occurring unless the same information
is available to the regulatory authority as a result of a previous inspection. When the inspection
results from information provided to the regulatory authority by any person, the regulatory
authority shall notify such person when the inspection is proposed to be carried out and such
person shall be allowed to accompany the inspector during the inspection. The regulatory authority
shall consult with all state and federal agencies charged...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-93.htm - 9K - Match Info - Similar pages

9-16-82
Section 9-16-82 Permits - Required; term; successor in interest; termination; renewal;
application. (a) No person shall engage in surface coal mining operations at a particular
location except as a subcontractor of the permittee of that location until such person has
been issued a permit by the regulatory authority for that location in accordance with the
provisions of this section. The term of a permit shall not exceed five years and shall
authorize the permittee to engage in surface coal mining operations within the permitted area,
unless sooner suspended or revoked in accordance with the provisions of this article. However,
if the applicant demonstrates that a specified longer term is reasonably needed to allow the
applicant to obtain the necessary financing for equipment and the opening of the operation
and that the application is full and complete for such specified longer term, the regulatory
authority may grant a permit for such longer term. A successor in interest of a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-82.htm - 5K - Match Info - Similar pages

9-16-72
Section 9-16-72 Definitions. The following words and phrases, unless a different meaning
is plainly required by the context, shall have the following meanings: (1) APPLICANT. Any
person or legal entity who or which applied for a license or a permit to engage in surface
coal mining operations. (2) APPROXIMATE ORIGINAL CONTOUR. That surface configuration achieved
by filling and grading of the mined area so that the reclaimed area, including any terracing
or access roads, closely resembles the general surface configuration of the land prior to
mining and blends into and complements the drainage pattern of the surrounding terrain, with
all high walls and spoil piles eliminated; water impoundments may be permitted where the commission
determines that they are in compliance with this article. (3) COAL BROKER and COAL SALES AGENCY.
Those persons whose principal business is the buying and reselling of coal, or the negotiation
or soliciting of coal sales between operators and purchasers; where...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-72.htm - 7K - Match Info - Similar pages

9-16-85
Section 9-16-85 Permits - Approval or denial by authority; filing of violation schedule;
issuance to mine on prime farm land. (a) Upon the basis of a complete mining application and
reclamation plan or a revision or renewal thereof, as required by this article, following
public notification and opportunity for a public hearing as required by Section 9-16-88,
the regulatory authority shall grant, require modification of, or deny the permit within 30
days and notify the applicant in writing of its action. The applicant for a permit, or revision
of a permit, shall have the burden of establishing that his application is in compliance with
all the requirements of this article. Within 10 days after the granting of a permit, the regulatory
authority shall notify the local governmental officials in the local political subdivision
in which the area of land to be affected is located that a permit has been issued and shall
describe the location of the land. (b) No permit or revision application...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-85.htm - 6K - Match Info - Similar pages