9-16-89
Section 9-16-89 Performance bonds and bond releases. (a) After a surface coal mining and reclamation permit application has been approved but before such a permit is issued, the applicant shall file with the regulatory authority, on a form prescribed and furnished by the regulatory authority, a bond for performance payable to the state and conditioned upon faithful performance of all the requirements of this article and the permit. The bond shall cover all lands disturbed by the surface coal mining operation and the amount of the initial bond shall be such to cover that area of land within the permit area upon which the operator will initiate and conduct surface coal mining and reclamation operations within the initial term of the permit. As succeeding increments of surface coal mining and reclamation operations are to be initiated and conducted within the permit area, the permittee shall file with the regulatory authority an additional bond or bonds to cover such increments in...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-89.htm - 10K - Match Info - Similar pages
9-16-90
/occupiers in such areas prior to any blasting; b. Maintain for a period of at least three years and make available for public inspection upon request a log detailing the location of the blasts, the pattern and depth of the drill holes, the amount of explosives used per hole, and the order and length of delay in the blasts; c. Limit the type of explosives and detonating equipment, the size, the timing and frequency of blasts based upon the physical conditions of the site so as to prevent (i) injury to persons, (ii) damage to public and private property outside the permit area, (iii) adverse impacts on any underground mine, and (iv) change in the course, channel, or availability of ground or surface water outside the permit area; d. Require that all blasting operations be conducted by trained and competent persons as certified by the regulatory authority; e. Provide that upon the request of a resident or owner of a man-made dwelling or structure within one-half mile of any portion of...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-90.htm - 30K - Match Info - Similar pages
9-16-88
Section 9-16-88 Permits - Review and appeal of applications. (a) At the time of submission of an application for a surface coal mining and reclamation permit, or revision of an existing permit, pursuant to the provisions of this article, the applicant shall submit to the regulatory authority a copy of his advertisement of the ownership, precise location, and boundaries of the land to be affected. At the time of submission such advertisement shall be placed by the applicant in a local newspaper of general circulation in the locality of the proposed surface mine at least once a week for four consecutive weeks. The regulatory authority shall notify various local governmental bodies, planning agencies, and sewage and water treatment authorities or water companies in the locality in which the proposed surface mining will take place, notifying them of the operator's intention to surface mine a particularly described tract of land and indicating the application's permit number and where a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-88.htm - 5K - Match Info - Similar pages
9-16-82
Section 9-16-82 Permits - Required; term; successor in interest; termination; renewal; application. (a) No person shall engage in surface coal mining operations at a particular location except as a subcontractor of the permittee of that location until such person has been issued a permit by the regulatory authority for that location in accordance with the provisions of this section. The term of a permit shall not exceed five years and shall authorize the permittee to engage in surface coal mining operations within the permitted area, unless sooner suspended or revoked in accordance with the provisions of this article. However, if the applicant demonstrates that a specified longer term is reasonably needed to allow the applicant to obtain the necessary financing for equipment and the opening of the operation and that the application is full and complete for such specified longer term, the regulatory authority may grant a permit for such longer term. A successor in interest of a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-82.htm - 5K - Match Info - Similar pages
9-16-83
seam itself. (f) Each applicant for a permit shall be required to submit to the regulatory authority as part of the permit application a certificate issued by an insurance company authorized to do business in the state certifying that the applicant has a public liability insurance policy in force for the surface mining and reclamation operations for which such permit is sought, or evidence that the applicant has satisfied other state self-insurance requirements. The policy shall provide for personal injury and property damage protection in an amount adequate to compensate any persons damaged as a result of surface coal mining and reclamation operations including use of explosives and entitled to compensation under the applicable provisions of state law. The policy shall be maintained in full force and effect during the terms of the permit or any renewal, including the length of all reclamation operations. (g) Each applicant for a surface coal mining and reclamation permit shall...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-83.htm - 13K - Match Info - Similar pages
9-16-72
commission and this article. (5) IMMINENT DANGER TO THE HEALTH AND SAFETY OF THE PUBLIC. The existence of any condition or practice, or any violation of a permit or other requirement of this article in a surface coal mining and reclamation operation, which condition, practice, or violation could reasonably be expected to cause substantial physical harm to persons outside the permit area before such condition, practice, or violation can be abated. A reasonable expectation of death or serious injury before abatement exists if a rational person, subjected to the same conditions or practices giving rise to the peril, would not expose himself or herself to the danger during the time necessary for abatement. (6) LICENSE. An authorization issued pursuant to Section 9-16-81 which identifies persons eligible to conduct surface coal mining and reclamation operations. (7) OPERATOR. Any person conducting surface coal mining and reclamation operations and includes permittees and their...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-72.htm - 7K - Match Info - Similar pages
9-16-94
Section 9-16-94 Penalties. (a) Any permittee or operator who violates any permit condition or who violates any other provision of this article, may be assessed a civil penalty by the regulatory authority, except that if such violation leads to the issuance of a cessation order under Section 9-16-93, the civil penalty shall be assessed. Such penalty shall not exceed $5,000.00 for each violation. Each day of continuing violation may be deemed a separate violation for purposes of penalty assessments. In determining the amount of the penalty, consideration shall be given to the permittee's history of previous violations at the particular surface coal mining operations; the seriousness of the violation, including any irreparable harm to the environment and any hazard to the health or safety of the public; whether the permittee was negligent; and the demonstrated good faith of the permittee charged in attempting to achieve rapid compliance after notification of the violation. (b) A civil...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-94.htm - 7K - Match Info - Similar pages
9-16-96
Section 9-16-96 Designation of areas unsuitable for surface coal mining; right to petition; review and public hearing; areas exempt from mining operations. (a)(1) The regulatory authority shall establish a planning process enabling objective decisions based upon competent and scientifically sound data and information as to which, if any, land areas of the state are unsuitable for all or certain types of surface coal mining operations pursuant to the standards set forth in subdivisions (2) and (3) of this subsection but such designation shall not prevent the mineral exploration pursuant to the article of any area so designated. (2) Upon petition pursuant to subsection (c) of this section, the regulatory authority shall designate an area as unsuitable for all or certain types of surface coal mining operations if the regulatory authority determines that reclamation pursuant to the requirements of this article is not technologically and economically feasible. (3) Upon petition pursuant to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-96.htm - 8K - Match Info - Similar pages
9-16-93
such person when the inspection is proposed to be carried out and such person shall be allowed to accompany the inspector during the inspection. The regulatory authority shall consult with all state and federal agencies charged with the enforcement of mine safety regulations and shall ensure that the person accompanying the inspector complies with appropriate safety standards and regulations. The regulatory authority shall provide that the person accompanying the inspector assumes the risk of personal injury where such injury results from conduct of the operator which is neither negligent nor intentional and where the person accompanying the inspector fails to comply with appropriate safety standards and regulations. (b) When on the basis of an inspection by an authorized representative of the regulatory authority, the regulatory authority or its authorized representative determines that any condition or practice exists or that any permittee is in violation of any requirement of this...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-93.htm - 9K - Match Info - Similar pages
9-16-85
Section 9-16-85 Permits - Approval or denial by authority; filing of violation schedule; issuance to mine on prime farm land. (a) Upon the basis of a complete mining application and reclamation plan or a revision or renewal thereof, as required by this article, following public notification and opportunity for a public hearing as required by Section 9-16-88, the regulatory authority shall grant, require modification of, or deny the permit within 30 days and notify the applicant in writing of its action. The applicant for a permit, or revision of a permit, shall have the burden of establishing that his application is in compliance with all the requirements of this article. Within 10 days after the granting of a permit, the regulatory authority shall notify the local governmental officials in the local political subdivision in which the area of land to be affected is located that a permit has been issued and shall describe the location of the land. (b) No permit or revision application...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-85.htm - 6K - Match Info - Similar pages
|