9-16-83
seam itself. (f) Each applicant for a permit shall be required to submit to the regulatory authority as part of the permit application a certificate issued by an insurance company authorized to do business in the state certifying that the applicant has a public liability insurance policy in force for the surface mining and reclamation operations for which such permit is sought, or evidence that the applicant has satisfied other state self-insurance requirements. The policy shall provide for personal injury and property damage protection in an amount adequate to compensate any persons damaged as a result of surface coal mining and reclamation operations including use of explosives and entitled to compensation under the applicable provisions of state law. The policy shall be maintained in full force and effect during the terms of the permit or any renewal, including the length of all reclamation operations. (g) Each applicant for a surface coal mining and reclamation permit shall...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-83.htm - 13K - Match Info - Similar pages
9-16-89
Section 9-16-89 Performance bonds and bond releases. (a) After a surface coal mining and reclamation permit application has been approved but before such a permit is issued, the applicant shall file with the regulatory authority, on a form prescribed and furnished by the regulatory authority, a bond for performance payable to the state and conditioned upon faithful performance of all the requirements of this article and the permit. The bond shall cover all lands disturbed by the surface coal mining operation and the amount of the initial bond shall be such to cover that area of land within the permit area upon which the operator will initiate and conduct surface coal mining and reclamation operations within the initial term of the permit. As succeeding increments of surface coal mining and reclamation operations are to be initiated and conducted within the permit area, the permittee shall file with the regulatory authority an additional bond or bonds to cover such increments in...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-89.htm - 10K - Match Info - Similar pages
9-16-88
Section 9-16-88 Permits - Review and appeal of applications. (a) At the time of submission of an application for a surface coal mining and reclamation permit, or revision of an existing permit, pursuant to the provisions of this article, the applicant shall submit to the regulatory authority a copy of his advertisement of the ownership, precise location, and boundaries of the land to be affected. At the time of submission such advertisement shall be placed by the applicant in a local newspaper of general circulation in the locality of the proposed surface mine at least once a week for four consecutive weeks. The regulatory authority shall notify various local governmental bodies, planning agencies, and sewage and water treatment authorities or water companies in the locality in which the proposed surface mining will take place, notifying them of the operator's intention to surface mine a particularly described tract of land and indicating the application's permit number and where a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-88.htm - 5K - Match Info - Similar pages
9-16-90
/occupiers in such areas prior to any blasting; b. Maintain for a period of at least three years and make available for public inspection upon request a log detailing the location of the blasts, the pattern and depth of the drill holes, the amount of explosives used per hole, and the order and length of delay in the blasts; c. Limit the type of explosives and detonating equipment, the size, the timing and frequency of blasts based upon the physical conditions of the site so as to prevent (i) injury to persons, (ii) damage to public and private property outside the permit area, (iii) adverse impacts on any underground mine, and (iv) change in the course, channel, or availability of ground or surface water outside the permit area; d. Require that all blasting operations be conducted by trained and competent persons as certified by the regulatory authority; e. Provide that upon the request of a resident or owner of a man-made dwelling or structure within one-half mile of any portion of...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-90.htm - 30K - Match Info - Similar pages
9-16-85
Section 9-16-85 Permits - Approval or denial by authority; filing of violation schedule; issuance to mine on prime farm land. (a) Upon the basis of a complete mining application and reclamation plan or a revision or renewal thereof, as required by this article, following public notification and opportunity for a public hearing as required by Section 9-16-88, the regulatory authority shall grant, require modification of, or deny the permit within 30 days and notify the applicant in writing of its action. The applicant for a permit, or revision of a permit, shall have the burden of establishing that his application is in compliance with all the requirements of this article. Within 10 days after the granting of a permit, the regulatory authority shall notify the local governmental officials in the local political subdivision in which the area of land to be affected is located that a permit has been issued and shall describe the location of the land. (b) No permit or revision application...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-85.htm - 6K - Match Info - Similar pages
9-16-82
Section 9-16-82 Permits - Required; term; successor in interest; termination; renewal; application. (a) No person shall engage in surface coal mining operations at a particular location except as a subcontractor of the permittee of that location until such person has been issued a permit by the regulatory authority for that location in accordance with the provisions of this section. The term of a permit shall not exceed five years and shall authorize the permittee to engage in surface coal mining operations within the permitted area, unless sooner suspended or revoked in accordance with the provisions of this article. However, if the applicant demonstrates that a specified longer term is reasonably needed to allow the applicant to obtain the necessary financing for equipment and the opening of the operation and that the application is full and complete for such specified longer term, the regulatory authority may grant a permit for such longer term. A successor in interest of a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-82.htm - 5K - Match Info - Similar pages
9-16-72
commission and this article. (5) IMMINENT DANGER TO THE HEALTH AND SAFETY OF THE PUBLIC. The existence of any condition or practice, or any violation of a permit or other requirement of this article in a surface coal mining and reclamation operation, which condition, practice, or violation could reasonably be expected to cause substantial physical harm to persons outside the permit area before such condition, practice, or violation can be abated. A reasonable expectation of death or serious injury before abatement exists if a rational person, subjected to the same conditions or practices giving rise to the peril, would not expose himself or herself to the danger during the time necessary for abatement. (6) LICENSE. An authorization issued pursuant to Section 9-16-81 which identifies persons eligible to conduct surface coal mining and reclamation operations. (7) OPERATOR. Any person conducting surface coal mining and reclamation operations and includes permittees and their...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-72.htm - 7K - Match Info - Similar pages
9-16-84
Section 9-16-84 Reclamation plans; contents. (a) Each reclamation plan submitted as part of a permit application pursuant to the provisions of this article shall include, in the degree of detail necessary to demonstrate that reclamation required can be accomplished, a statement of: (1) The identification of the lands subject to surface coal mining operations over the estimated life of those operations and the size, sequence, and timing of the sub-areas for which it is anticipated that individual permits for mining will be sought; (2) The condition of the land to be covered by the permit prior to any mining including: a. The uses existing at the time of the application, and if the land has a history of previous mining, the uses which preceded any mining; and b. The capability of the land prior to any mining to support a variety of uses giving consideration to soil and foundation characteristics, topography, and vegetative cover, and, if applicable, a soil survey prepared pursuant to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-84.htm - 5K - Match Info - Similar pages
9-16-79
Section 9-16-79 Hearings and appeals procedure. Procedures for hearings and appeals under this article shall be made as herein provided and in accordance with such general rules and regulations as the regulatory authority may prescribe. These procedures shall take precedence over the Alabama Administrative Procedure Act, which shall in no respect apply to proceedings arising under this article. (1)a. A determination by the regulatory authority as specified by law shall be made promptly and shall include a statement as to the action to be taken and reasons therefor. Notice of the determination or decision shall be promptly given to the parties involved by delivery or by mailing such notices to their last known addresses. When the regulatory authority gives a notice of determination, unless an appeal is filed by any person having an interest which may be adversely affected with the chief hearing officer within 30 days of such notice such determination shall be deemed final and not...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-79.htm - 11K - Match Info - Similar pages
9-16-91
Section 9-16-91 Surface effects of underground coal mining; requirements; remedies. (a) The regulatory authority shall promulgate rules and regulations directed toward the surface effects of underground coal mining operations, and embodying the following requirements. In adopting any rules and regulations, the regulatory authority shall consider all distinct differences between surface coal mining and underground coal mining. (b) Each permit issued pursuant to this article and relating to underground coal mining shall require the operator to: (1) Adopt measures consistent with available technology in order to prevent subsidence causing material damage to the extent technologically and economically feasible, maximize mine stability, and maintain the value and reasonably foreseeable use of such surface lands, except in those instances where the mining methods used requires planned subsidence in a predictable and controlled manner. Nothing in this subsection shall be construed to prohibit...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-91.htm - 10K - Match Info - Similar pages
|