9-16-82
Section 9-16-82 Permits - Required; term; successor in interest; termination; renewal; application. (a) No person shall engage in surface coal mining operations at a particular location except as a subcontractor of the permittee of that location until such person has been issued a permit by the regulatory authority for that location in accordance with the provisions of this section. The term of a permit shall not exceed five years and shall authorize the permittee to engage in surface coal mining operations within the permitted area, unless sooner suspended or revoked in accordance with the provisions of this article. However, if the applicant demonstrates that a specified longer term is reasonably needed to allow the applicant to obtain the necessary financing for equipment and the opening of the operation and that the application is full and complete for such specified longer term, the regulatory authority may grant a permit for such longer term. A successor in interest of a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-82.htm - 5K - Match Info - Similar pages
9-16-89
Section 9-16-89 Performance bonds and bond releases. (a) After a surface coal mining and reclamation permit application has been approved but before such a permit is issued, the applicant shall file with the regulatory authority, on a form prescribed and furnished by the regulatory authority, a bond for performance payable to the state and conditioned upon faithful performance of all the requirements of this article and the permit. The bond shall cover all lands disturbed by the surface coal mining operation and the amount of the initial bond shall be such to cover that area of land within the permit area upon which the operator will initiate and conduct surface coal mining and reclamation operations within the initial term of the permit. As succeeding increments of surface coal mining and reclamation operations are to be initiated and conducted within the permit area, the permittee shall file with the regulatory authority an additional bond or bonds to cover such increments in...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-89.htm - 10K - Match Info - Similar pages
9-16-90
Section 9-16-90 Environmental protection performance standards. (a) Any permit issued pursuant to this article to conduct surface mining operations shall require that such surface coal mining operations will meet all applicable performance standards of this article, and such other requirements as the regulatory authority shall promulgate. (b) General performance standards shall be applicable to all surface coal mining and reclamation operations and shall require the operation as a minimum to: (1) Conduct surface coal mining operations so as to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future through surface coal mining can be minimized; (2) Restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-90.htm - 30K - Match Info - Similar pages
9-16-83
Section 9-16-83 Permits - Contents of application; reclamation plan; copy of application filed for public inspection; insurance; blasting plan. (a) Each application for a surface coal mining reclamation permit under this article shall be accompanied by a fee as determined by the regulatory authority, but not to exceed the anticipated cost of reviewing, administering, and enforcing the permit. In no event shall the permit fee be less than one thousand dollars ($1,000). The regulatory authority shall develop procedures to enable the cost of the fee to be paid over the life of the mine. The life of the mine means the term of the permit and the time required to successfully complete all surface coal mining and reclamation activities and obtain a full release of the performance bond for each bonded area. (b) The permit application shall be submitted in a format prescribed by and satisfactory to the regulatory authority and shall contain, among other things, all of the following: (1) The...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-83.htm - 13K - Match Info - Similar pages
9-16-84
Section 9-16-84 Reclamation plans; contents. (a) Each reclamation plan submitted as part of a permit application pursuant to the provisions of this article shall include, in the degree of detail necessary to demonstrate that reclamation required can be accomplished, a statement of: (1) The identification of the lands subject to surface coal mining operations over the estimated life of those operations and the size, sequence, and timing of the sub-areas for which it is anticipated that individual permits for mining will be sought; (2) The condition of the land to be covered by the permit prior to any mining including: a. The uses existing at the time of the application, and if the land has a history of previous mining, the uses which preceded any mining; and b. The capability of the land prior to any mining to support a variety of uses giving consideration to soil and foundation characteristics, topography, and vegetative cover, and, if applicable, a soil survey prepared pursuant to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-84.htm - 5K - Match Info - Similar pages
22-27-2
Section 22-27-2 Definitions. For the purpose of this article, the following terms shall have the meanings respectively ascribed to them by this section: (1) AGENCY. Any controlling agency, public or private, elected, appointed, or volunteer utilizing methods approved by the health department or the department for the purpose of controlling and supervising the collection or management of solid wastes or recyclable materials. (2) ALTERNATIVE COVER. Material other than earth used to cover a landfill or sanitary landfill. An alternative cover shall be approved by the Department of Environmental Management in compliance with federal law and United States Environmental Protection Agency rules or guidance to achieve a level of performance equal to or greater than earthen cover material. (3) ASHES. The solid residue from burning of wood, coal, coke, or other combustible material used for heating, from incineration of solid wastes, or for the production of electricity at electric generating...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/22-27-2.htm - 14K - Match Info - Similar pages
9-16-91
Section 9-16-91 Surface effects of underground coal mining; requirements; remedies. (a) The regulatory authority shall promulgate rules and regulations directed toward the surface effects of underground coal mining operations, and embodying the following requirements. In adopting any rules and regulations, the regulatory authority shall consider all distinct differences between surface coal mining and underground coal mining. (b) Each permit issued pursuant to this article and relating to underground coal mining shall require the operator to: (1) Adopt measures consistent with available technology in order to prevent subsidence causing material damage to the extent technologically and economically feasible, maximize mine stability, and maintain the value and reasonably foreseeable use of such surface lands, except in those instances where the mining methods used requires planned subsidence in a predictable and controlled manner. Nothing in this subsection shall be construed to prohibit...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-91.htm - 10K - Match Info - Similar pages
9-16-72
Section 9-16-72 Definitions. The following words and phrases, unless a different meaning is plainly required by the context, shall have the following meanings: (1) APPLICANT. Any person or legal entity who or which applied for a license or a permit to engage in surface coal mining operations. (2) APPROXIMATE ORIGINAL CONTOUR. That surface configuration achieved by filling and grading of the mined area so that the reclaimed area, including any terracing or access roads, closely resembles the general surface configuration of the land prior to mining and blends into and complements the drainage pattern of the surrounding terrain, with all high walls and spoil piles eliminated; water impoundments may be permitted where the commission determines that they are in compliance with this article. (3) COAL BROKER and COAL SALES AGENCY. Those persons whose principal business is the buying and reselling of coal, or the negotiation or soliciting of coal sales between operators and purchasers; where...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-72.htm - 7K - Match Info - Similar pages
9-16-92
Section 9-16-92 Inspections; authority to inspect records, equipment, premises; etc.; violations; maintenance of records, etc., by permittee; authority to enter upon all lands of the state. (a) For the purpose of developing or assisting in the development, administration, and enforcement of this article or in the administration and enforcement of any permit under this article, or of determining whether any person is in violation of any requirement of this article: (1) The regulatory authority shall require any permittee to (i) establish and maintain appropriate records, (ii) make monthly reports to the regulatory authority, (iii) install, use, and maintain any necessary monitoring equipment or methods, (iv) evaluate results in accordance with such methods, at such locations, intervals, and in such manner as the regulatory authority shall prescribe, and (v) provide such other information relative to surface coal mining and reclamation operations as the regulatory authority deems...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-92.htm - 5K - Match Info - Similar pages
9-16-88
Section 9-16-88 Permits - Review and appeal of applications. (a) At the time of submission of an application for a surface coal mining and reclamation permit, or revision of an existing permit, pursuant to the provisions of this article, the applicant shall submit to the regulatory authority a copy of his advertisement of the ownership, precise location, and boundaries of the land to be affected. At the time of submission such advertisement shall be placed by the applicant in a local newspaper of general circulation in the locality of the proposed surface mine at least once a week for four consecutive weeks. The regulatory authority shall notify various local governmental bodies, planning agencies, and sewage and water treatment authorities or water companies in the locality in which the proposed surface mining will take place, notifying them of the operator's intention to surface mine a particularly described tract of land and indicating the application's permit number and where a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-88.htm - 5K - Match Info - Similar pages
|