Code of Alabama

Search for this:
 Search these answers
1 through 10 of 261 similar documents, best matches first.
  Page: 1 2 3 4 5 6 7 8 9 10   next>>

9-16-5
Section 9-16-5 Permit for engaging in surface mining operations - Application; issuance. (a)
Any operator desiring a permit shall file an application with the department upon a form furnished
by the department containing all of the following: (1) A brief description of the tract or
tracts of land and the estimated number of acres to be affected by the applicant's surface
mining thereon during the permit period. The description shall include the section, township,
range, and county in which the land is located and shall otherwise describe the land with
sufficient clarity so it may be located and distinguished from other lands. The description
shall also include a description of access to the area from the nearest public highway (2)
A statement by the applicant that the applicant has the right and power by legal estate owned
to mine by surface mining the land so described. The statement shall set forth by reference
the source of the applicant's right and power to so mine. (3) A statement...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-5.htm - 3K - Match Info - Similar pages

9-16-83
seam itself. (f) Each applicant for a permit shall be required to submit to the regulatory
authority as part of the permit application a certificate issued by an insurance company authorized
to do business in the state certifying that the applicant has a public liability insurance
policy in force for the surface mining and reclamation operations for which such permit is
sought, or evidence that the applicant has satisfied other state self-insurance requirements.
The policy shall provide for personal injury and property damage protection
in an amount adequate to compensate any persons damaged as a result of surface coal mining
and reclamation operations including use of explosives and entitled to compensation under
the applicable provisions of state law. The policy shall be maintained in full force and effect
during the terms of the permit or any renewal, including the length of all reclamation operations.
(g) Each applicant for a surface coal mining and reclamation permit shall...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-83.htm - 13K - Match Info - Similar pages

9-16-84
Section 9-16-84 Reclamation plans; contents. (a) Each reclamation plan submitted as part of
a permit application pursuant to the provisions of this article shall include, in the degree
of detail necessary to demonstrate that reclamation required can be accomplished, a statement
of: (1) The identification of the lands subject to surface coal mining operations over the
estimated life of those operations and the size, sequence, and timing of the sub-areas for
which it is anticipated that individual permits for mining will be sought; (2) The condition
of the land to be covered by the permit prior to any mining including: a. The uses existing
at the time of the application, and if the land has a history of previous mining, the uses
which preceded any mining; and b. The capability of the land prior to any mining to support
a variety of uses giving consideration to soil and foundation characteristics, topography,
and vegetative cover, and, if applicable, a soil survey prepared pursuant to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-84.htm - 5K - Match Info - Similar pages

9-16-89
Section 9-16-89 Performance bonds and bond releases. (a) After a surface coal mining and reclamation
permit application has been approved but before such a permit is issued, the applicant shall
file with the regulatory authority, on a form prescribed and furnished by the regulatory authority,
a bond for performance payable to the state and conditioned upon faithful performance of all
the requirements of this article and the permit. The bond shall cover all lands disturbed
by the surface coal mining operation and the amount of the initial bond shall be such to cover
that area of land within the permit area upon which the operator will initiate and conduct
surface coal mining and reclamation operations within the initial term of the permit. As succeeding
increments of surface coal mining and reclamation operations are to be initiated and conducted
within the permit area, the permittee shall file with the regulatory authority an additional
bond or bonds to cover such increments in...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-89.htm - 10K - Match Info - Similar pages

9-16-85
Section 9-16-85 Permits - Approval or denial by authority; filing of violation schedule; issuance
to mine on prime farm land. (a) Upon the basis of a complete mining application and reclamation
plan or a revision or renewal thereof, as required by this article, following public notification
and opportunity for a public hearing as required by Section 9-16-88, the regulatory authority
shall grant, require modification of, or deny the permit within 30 days and notify the applicant
in writing of its action. The applicant for a permit, or revision of a permit, shall have
the burden of establishing that his application is in compliance with all the requirements
of this article. Within 10 days after the granting of a permit, the regulatory authority shall
notify the local governmental officials in the local political subdivision in which the area
of land to be affected is located that a permit has been issued and shall describe the location
of the land. (b) No permit or revision application...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-85.htm - 6K - Match Info - Similar pages

9-16-81
Section 9-16-81 Licenses required; application; qualifications; fees. (a) All surface coal
mining operations shall be subject to this article, except as excluded in Section 9-16-99.
(b) No person shall engage in or carry out on lands within the state any surface coal mining
operations unless such person is a citizen of the United States or, if not a citizen of the
United States, a person who is legally present in the United States with appropriate documentation
from the federal government and has first obtained a license in accordance with this section.
The term of a license shall be continuous and shall authorize the licensee, subject to the
other provisions of this article, to engage in surface coal mining operations unless the license
shall be suspended or revoked in accordance with this article. Suspension, revocation, or
subcontracting shall in no way relieve the licensee of his or her obligation to comply with
the reclamation requirement of this article. (c) An applicant for a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-81.htm - 6K - Match Info - Similar pages

9-16-79
Section 9-16-79 Hearings and appeals procedure. Procedures for hearings and appeals under this
article shall be made as herein provided and in accordance with such general rules and regulations
as the regulatory authority may prescribe. These procedures shall take precedence over the
Alabama Administrative Procedure Act, which shall in no respect apply to proceedings arising
under this article. (1)a. A determination by the regulatory authority as specified by law
shall be made promptly and shall include a statement as to the action to be taken and reasons
therefor. Notice of the determination or decision shall be promptly given to the parties involved
by delivery or by mailing such notices to their last known addresses. When the regulatory
authority gives a notice of determination, unless an appeal is filed by any person having
an interest which may be adversely affected with the chief hearing officer within 30 days
of such notice such determination shall be deemed final and not...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-79.htm - 11K - Match Info - Similar pages

9-16-88
Section 9-16-88 Permits - Review and appeal of applications. (a) At the time of submission
of an application for a surface coal mining and reclamation permit, or revision of an existing
permit, pursuant to the provisions of this article, the applicant shall submit to the regulatory
authority a copy of his advertisement of the ownership, precise location, and boundaries of
the land to be affected. At the time of submission such advertisement shall be placed by the
applicant in a local newspaper of general circulation in the locality of the proposed surface
mine at least once a week for four consecutive weeks. The regulatory authority shall notify
various local governmental bodies, planning agencies, and sewage and water treatment authorities
or water companies in the locality in which the proposed surface mining will take place, notifying
them of the operator's intention to surface mine a particularly described tract of land and
indicating the application's permit number and where a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-88.htm - 5K - Match Info - Similar pages

9-16-7
Section 9-16-7 Duties of operators. (a) Every operator to whom a permit is issued pursuant
to this article and who engages in surface mining on lands described in the permit shall:
(1) Submit to the department, no later than 90 days after expiration of the permit period,
a map or aerial photograph showing the location of the surface mining operation conducted
during the permit period by section, township, range, and county with other description to
identify the land upon which the operator has conducted surface mining during the permit period.
The map or aerial photograph shall include a legend showing the number of acres of affected
land and the reclamation to be made in accordance with this section. (2) Commence contemporaneous
reclamation of mined areas as set out in the comprehensive reclamation plan approved by the
department. Reclamation bonds shall be adjusted annually to reflect unreclaimed disturbed
acreage as well as reclaimed acreage released by the department. Failure to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-7.htm - 5K - Match Info - Similar pages

9-16-90
/occupiers in such areas prior to any blasting; b. Maintain for a period of at least three
years and make available for public inspection upon request a log detailing the location of
the blasts, the pattern and depth of the drill holes, the amount of explosives used per hole,
and the order and length of delay in the blasts; c. Limit the type of explosives and detonating
equipment, the size, the timing and frequency of blasts based upon the physical conditions
of the site so as to prevent (i) injury to persons, (ii) damage to public and private
property outside the permit area, (iii) adverse impacts on any underground mine, and (iv)
change in the course, channel, or availability of ground or surface water outside the permit
area; d. Require that all blasting operations be conducted by trained and competent persons
as certified by the regulatory authority; e. Provide that upon the request of a resident or
owner of a man-made dwelling or structure within one-half mile of any portion of...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-90.htm - 30K - Match Info - Similar pages

1 through 10 of 261 similar documents, best matches first.
  Page: 1 2 3 4 5 6 7 8 9 10   next>>