9-16-127
Section 9-16-127 Acquisition and disposition of lands. (a) The director, with the approval of the Secretary of Interior, may acquire title in the name of the state to any land or interest therein by purchase, donation, or condemnation if such land or interest is adversely affected by past coal mining practices and upon a determination that acquisition of such land is necessary to successful reclamation and that: (1) The acquired land after restoration, reclamation, abatement, control or prevention of the adverse effects of past coal mining practices will serve recreation and historical purposes, conservation and reclamation purposes or provide open space benefits; and (2) Permanent facilities such as a treatment plant or a relocated stream channel will be constructed on the land for restoration, reclamation, abatement, control or prevention of the adverse effects of past coal mining practices; or (3) Acquisition of coal refuse disposal sites and all coal refuse thereon will serve the...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-127.htm - 5K - Match Info - Similar pages
9-16-121
Section 9-16-121 Definitions. For the purpose of this article the following terms shall have the following meanings unless the context clearly indicates otherwise: (1) ABANDONED MINE LANDS. Lands affected by the mining of coal prior to November 5, 1990, and left in either an unreclaimed or inadequately reclaimed condition, and for which there is no continuing reclamation responsibility required under state or federal law, and which continue in their present condition to substantially degrade the quality of the environment, prevent or damage the beneficial use of land or water resources, or endanger the health or safety of the public. (2) DIRECTOR. The Secretary of Labor or his or her authorized agents or representatives. (3) FEDERAL ACT. Title IV, "Abandoned Mine Reclamation," of Public Law 95-87 of the 95th U. S. Congress. (4) FUND. State Abandoned Mine Reclamation Fund. (5) SECRETARY. The Secretary of the United States Department of Interior. (6) STATE RECLAMATION PROGRAM. The state...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-121.htm - 1K - Match Info - Similar pages
9-16-72
Section 9-16-72 Definitions. The following words and phrases, unless a different meaning is plainly required by the context, shall have the following meanings: (1) APPLICANT. Any person or legal entity who or which applied for a license or a permit to engage in surface coal mining operations. (2) APPROXIMATE ORIGINAL CONTOUR. That surface configuration achieved by filling and grading of the mined area so that the reclaimed area, including any terracing or access roads, closely resembles the general surface configuration of the land prior to mining and blends into and complements the drainage pattern of the surrounding terrain, with all high walls and spoil piles eliminated; water impoundments may be permitted where the commission determines that they are in compliance with this article. (3) COAL BROKER and COAL SALES AGENCY. Those persons whose principal business is the buying and reselling of coal, or the negotiation or soliciting of coal sales between operators and purchasers; where...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-72.htm - 7K - Match Info - Similar pages
9-16-129
Section 9-16-129 Property subject to lien; statement by director; amount; priority. (a) Within six months after the completion of projects to restore, reclaim, abate, control or prevent adverse effects of past coal mining practices on privately owned land, the director shall itemize the moneys so expended and may file a statement thereof in the probate judge's office of the county in which the land lies together with a notarized appraisal by a qualified independent appraiser of the value of the land before the restoration, reclamation, abatement, control or prevention of adverse effects of past coal mining practices if the moneys so expended shall result in a significant increase in property value. Such statement shall constitute a lien upon the said land. The lien shall not exceed the amount determined by the appraisal to be the increase in the market value of the land as a result of the restoration, reclamation, abatement, control or prevention of the adverse effects of past coal...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-129.htm - 2K - Match Info - Similar pages
9-16-98
Section 9-16-98 Experimental practices. In order to encourage advances in mining and reclamation practices or to allow post-mining land use for industrial, commercial, residential, or public use (including recreational facilities), the regulatory authority with approval by the Secretary of Interior may authorize departures in individual cases on an experimental basis from the environmental protection performance standards promulgated under Sections 9-16-90 and 9-16-91 of this article. Such departures may be authorized if (i) the experimental practices are potentially more or at least as environmentally protective, during and after mining operations, as those required by promulgated standards; (ii) the mining operations approved for particular land use or other purposes are no larger or more numerous than necessary to determine the effectiveness and economic feasibility of the experimental practices; and (iii) the experimental practices do not reduce the protection afforded public...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-98.htm - 1K - Match Info - Similar pages
9-16-126
Section 9-16-126 Right of entry. (a) If the director makes a finding in writing with supporting facts that: (1) Land or water resources have been adversely affected by past coal mining practices; and (2) The adverse effects are at a stage where, in the public interest, action to restore, reclaim, abate, control, or prevent should be taken; and (3) The owners of the land or water resources where entry must be made to restore, reclaim, abate, control, or prevent the adverse effects of past coal mining practices are not known, or readily available; or (4) The owners will not give permission for the state or its agents, employees, or contractors to enter upon such property to restore, reclaim, abate, control, or prevent the adverse effects of past coal mining practices. Then, upon giving notice by mail to the owners if known or if not known by posting notice upon the premises and advertising once in a newspaper of general circulation in the municipality in which the land lies, the...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-126.htm - 2K - Match Info - Similar pages
9-16-123
Section 9-16-123 Reclamation priorities. Expenditures of moneys from the fund on eligible lands and water shall reflect the following priorities in the order stated: (1) The protection of public health, safety, general welfare, and property from extreme danger of adverse effects of coal mining practices; (2) The protection of public health, safety and general welfare from adverse effects of coal mining practices; (3) The restoration of land and water resources and the environment previously degraded by adverse effects of coal mining practices including measures for the conservation and development of soil, water (excluding channelization), woodland, fish and wildlife, recreation resources, and agricultural productivity. (4) Research and demonstration projects relating to the development of surface mining reclamation and water quality control program methods and techniques; (5) The protection, repair, replacement, construction, or enhancement of public facilities such as utilities,...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-123.htm - 1K - Match Info - Similar pages
9-16-130
Section 9-16-130 Filling voids, sealing tunnels, shafts, etc. (a) The Governor may request the Secretary of Interior to authorize the director to fill voids, seal open or abandoned tunnels, shafts, and entryways, and reclaim surface impacts of underground or surface mining of minerals other than coal which the secretary determines could endanger life and property, constitute a hazard to public health and safety, or degrade the environment. The director is authorized and required to carry out such work pursuant to the request therefor by the secretary. (b) Funds available for use in carrying out the purpose of this section shall be limited to those funds which must be allocated to the state under the provisions of subsection 402(g) of Public Law 95-87. (c) In those instances where mine waste piles are being reworked for conservation purposes, the incremental costs of disposing of the wastes from such operations by filling voids and sealing tunnels may be eligible for funding providing...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-130.htm - 1K - Match Info - Similar pages
9-16-83
Section 9-16-83 Permits - Contents of application; reclamation plan; copy of application filed for public inspection; insurance; blasting plan. (a) Each application for a surface coal mining reclamation permit under this article shall be accompanied by a fee as determined by the regulatory authority, but not to exceed the anticipated cost of reviewing, administering, and enforcing the permit. In no event shall the permit fee be less than one thousand dollars ($1,000). The regulatory authority shall develop procedures to enable the cost of the fee to be paid over the life of the mine. The life of the mine means the term of the permit and the time required to successfully complete all surface coal mining and reclamation activities and obtain a full release of the performance bond for each bonded area. (b) The permit application shall be submitted in a format prescribed by and satisfactory to the regulatory authority and shall contain, among other things, all of the following: (1) The...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-83.htm - 13K - Match Info - Similar pages
9-16-85
Section 9-16-85 Permits - Approval or denial by authority; filing of violation schedule; issuance to mine on prime farm land. (a) Upon the basis of a complete mining application and reclamation plan or a revision or renewal thereof, as required by this article, following public notification and opportunity for a public hearing as required by Section 9-16-88, the regulatory authority shall grant, require modification of, or deny the permit within 30 days and notify the applicant in writing of its action. The applicant for a permit, or revision of a permit, shall have the burden of establishing that his application is in compliance with all the requirements of this article. Within 10 days after the granting of a permit, the regulatory authority shall notify the local governmental officials in the local political subdivision in which the area of land to be affected is located that a permit has been issued and shall describe the location of the land. (b) No permit or revision application...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-85.htm - 6K - Match Info - Similar pages
|