Code of Alabama

Search for this:
 Search these answers
1 through 10 of 238 similar documents, best matches first.
  Page: 1 2 3 4 5 6 7 8 9 10   next>>

9-16-124
Section 9-16-124 Lands and waters eligible for reclamation. For purposes of this article, lands
and water eligible for reclamation or drainage abatement expenditures are those which were
mined for coal or which were affected by the mining, wastebanks, coal processing, or other
coal mining processes, and abandoned or left in an inadequate reclamation status prior to
November 5, 1990, and for which there is no continuing reclamation responsibility under existing
state or federal law. (Acts 1981, No. 81-210, p. 254, §5; Acts 1993, No. 93-542, p. 894,
§1.)...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-124.htm - 871 bytes - Match Info - Similar pages

9-16-121
Section 9-16-121 Definitions. For the purpose of this article the following terms shall have
the following meanings unless the context clearly indicates otherwise: (1) ABANDONED MINE
LANDS. Lands affected by the mining of coal prior to November 5, 1990, and left in either
an unreclaimed or inadequately reclaimed condition, and for which there is no continuing reclamation
responsibility required under state or federal law, and which continue in their present condition
to substantially degrade the quality of the environment, prevent or damage the beneficial
use of land or water resources, or endanger the health or safety of the public. (2) DIRECTOR.
The Secretary of Labor or his or her authorized agents or representatives. (3) FEDERAL ACT.
Title IV, "Abandoned Mine Reclamation," of Public Law 95-87 of the 95th U. S. Congress.
(4) FUND. State Abandoned Mine Reclamation Fund. (5) SECRETARY. The Secretary of the United
States Department of Interior. (6) STATE RECLAMATION PROGRAM. The state...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-121.htm - 1K - Match Info - Similar pages

9-16-89
Section 9-16-89 Performance bonds and bond releases. (a) After a surface coal mining and reclamation
permit application has been approved but before such a permit is issued, the applicant shall
file with the regulatory authority, on a form prescribed and furnished by the regulatory authority,
a bond for performance payable to the state and conditioned upon faithful performance of all
the requirements of this article and the permit. The bond shall cover all lands disturbed
by the surface coal mining operation and the amount of the initial bond shall be such to cover
that area of land within the permit area upon which the operator will initiate and conduct
surface coal mining and reclamation operations within the initial term of the permit. As succeeding
increments of surface coal mining and reclamation operations are to be initiated and conducted
within the permit area, the permittee shall file with the regulatory authority an additional
bond or bonds to cover such increments in...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-89.htm - 10K - Match Info - Similar pages

9-16-96
Section 9-16-96 Designation of areas unsuitable for surface coal mining; right to petition;
review and public hearing; areas exempt from mining operations. (a)(1) The regulatory authority
shall establish a planning process enabling objective decisions based upon competent and scientifically
sound data and information as to which, if any, land areas of the state are unsuitable for
all or certain types of surface coal mining operations pursuant to the standards set forth
in subdivisions (2) and (3) of this subsection but such designation shall not prevent the
mineral exploration pursuant to the article of any area so designated. (2) Upon petition pursuant
to subsection (c) of this section, the regulatory authority shall designate an area as unsuitable
for all or certain types of surface coal mining operations if the regulatory authority determines
that reclamation pursuant to the requirements of this article is not technologically and economically
feasible. (3) Upon petition pursuant to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-96.htm - 8K - Match Info - Similar pages

9-16-90
/occupiers in such areas prior to any blasting; b. Maintain for a period of at least three
years and make available for public inspection upon request a log detailing the location of
the blasts, the pattern and depth of the drill holes, the amount of explosives used per hole,
and the order and length of delay in the blasts; c. Limit the type of explosives and detonating
equipment, the size, the timing and frequency of blasts based upon the physical conditions
of the site so as to prevent (i) injury to persons, (ii) damage to public and private
property outside the permit area, (iii) adverse impacts on any underground mine, and (iv)
change in the course, channel, or availability of ground or surface water outside the permit
area; d. Require that all blasting operations be conducted by trained and competent persons
as certified by the regulatory authority; e. Provide that upon the request of a resident or
owner of a man-made dwelling or structure within one-half mile of any portion of...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-90.htm - 30K - Match Info - Similar pages

9-16-72
commission and this article. (5) IMMINENT DANGER TO THE HEALTH AND SAFETY OF THE PUBLIC. The
existence of any condition or practice, or any violation of a permit or other requirement
of this article in a surface coal mining and reclamation operation, which condition, practice,
or violation could reasonably be expected to cause substantial physical harm to persons outside
the permit area before such condition, practice, or violation can be abated. A reasonable
expectation of death or serious injury before abatement exists if a rational person,
subjected to the same conditions or practices giving rise to the peril, would not expose himself
or herself to the danger during the time necessary for abatement. (6) LICENSE. An authorization
issued pursuant to Section 9-16-81 which identifies persons eligible to conduct surface coal
mining and reclamation operations. (7) OPERATOR. Any person conducting surface coal mining
and reclamation operations and includes permittees and their...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-72.htm - 7K - Match Info - Similar pages

9-16-81
Section 9-16-81 Licenses required; application; qualifications; fees. (a) All surface coal
mining operations shall be subject to this article, except as excluded in Section 9-16-99.
(b) No person shall engage in or carry out on lands within the state any surface coal mining
operations unless such person is a citizen of the United States or, if not a citizen of the
United States, a person who is legally present in the United States with appropriate documentation
from the federal government and has first obtained a license in accordance with this section.
The term of a license shall be continuous and shall authorize the licensee, subject to the
other provisions of this article, to engage in surface coal mining operations unless the license
shall be suspended or revoked in accordance with this article. Suspension, revocation, or
subcontracting shall in no way relieve the licensee of his or her obligation to comply with
the reclamation requirement of this article. (c) An applicant for a...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-81.htm - 6K - Match Info - Similar pages

9-16-123
Section 9-16-123 Reclamation priorities. Expenditures of moneys from the fund on eligible lands
and water shall reflect the following priorities in the order stated: (1) The protection of
public health, safety, general welfare, and property from extreme danger of adverse effects
of coal mining practices; (2) The protection of public health, safety and general welfare
from adverse effects of coal mining practices; (3) The restoration of land and water resources
and the environment previously degraded by adverse effects of coal mining practices including
measures for the conservation and development of soil, water (excluding channelization), woodland,
fish and wildlife, recreation resources, and agricultural productivity. (4) Research and demonstration
projects relating to the development of surface mining reclamation and water quality control
program methods and techniques; (5) The protection, repair, replacement, construction, or
enhancement of public facilities such as utilities,...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-123.htm - 1K - Match Info - Similar pages

9-16-127
Section 9-16-127 Acquisition and disposition of lands. (a) The director, with the approval
of the Secretary of Interior, may acquire title in the name of the state to any land or interest
therein by purchase, donation, or condemnation if such land or interest is adversely affected
by past coal mining practices and upon a determination that acquisition of such land is necessary
to successful reclamation and that: (1) The acquired land after restoration, reclamation,
abatement, control or prevention of the adverse effects of past coal mining practices will
serve recreation and historical purposes, conservation and reclamation purposes or provide
open space benefits; and (2) Permanent facilities such as a treatment plant or a relocated
stream channel will be constructed on the land for restoration, reclamation, abatement, control
or prevention of the adverse effects of past coal mining practices; or (3) Acquisition of
coal refuse disposal sites and all coal refuse thereon will serve the...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-127.htm - 5K - Match Info - Similar pages

9-16-84
Section 9-16-84 Reclamation plans; contents. (a) Each reclamation plan submitted as part of
a permit application pursuant to the provisions of this article shall include, in the degree
of detail necessary to demonstrate that reclamation required can be accomplished, a statement
of: (1) The identification of the lands subject to surface coal mining operations over the
estimated life of those operations and the size, sequence, and timing of the sub-areas for
which it is anticipated that individual permits for mining will be sought; (2) The condition
of the land to be covered by the permit prior to any mining including: a. The uses existing
at the time of the application, and if the land has a history of previous mining, the uses
which preceded any mining; and b. The capability of the land prior to any mining to support
a variety of uses giving consideration to soil and foundation characteristics, topography,
and vegetative cover, and, if applicable, a soil survey prepared pursuant to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-84.htm - 5K - Match Info - Similar pages

1 through 10 of 238 similar documents, best matches first.
  Page: 1 2 3 4 5 6 7 8 9 10   next>>