25-9-62
Section 25-9-62 Removal of large and dangerous accumulations of water in adjoining mines. In any coal mine or coal mines or parts thereof wherein water may have been allowed to accumulate in large and dangerous quantities, putting in danger the adjoining or adjacent coal mines and the lives of the miners working therein, and when such can be tapped and set free and flow by its own gravity to any point of drainage, any operator or person having a mine so endangered, with the approval of the department, may proceed and remove the said danger by driving a drift or drifts protected by bore holes as provided by this chapter, and, in removing said danger, it shall be lawful to drive across property lines if needful. All coal removed in such driving from adjacent lands shall be paid for on the basis of $.25 per ton of 2,000 pounds. No person shall dam or in any way obstruct the flow of water from said mine or parts thereof when so set on any part of its passage to point of drainage. (Acts...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/25-9-62.htm - 1K - Match Info - Similar pages
9-16-72
Section 9-16-72 Definitions. The following words and phrases, unless a different meaning is plainly required by the context, shall have the following meanings: (1) APPLICANT. Any person or legal entity who or which applied for a license or a permit to engage in surface coal mining operations. (2) APPROXIMATE ORIGINAL CONTOUR. That surface configuration achieved by filling and grading of the mined area so that the reclaimed area, including any terracing or access roads, closely resembles the general surface configuration of the land prior to mining and blends into and complements the drainage pattern of the surrounding terrain, with all high walls and spoil piles eliminated; water impoundments may be permitted where the commission determines that they are in compliance with this article. (3) COAL BROKER and COAL SALES AGENCY. Those persons whose principal business is the buying and reselling of coal, or the negotiation or soliciting of coal sales between operators and purchasers; where...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-72.htm - 7K - Match Info - Similar pages
9-16-91
Section 9-16-91 Surface effects of underground coal mining; requirements; remedies. (a) The regulatory authority shall promulgate rules and regulations directed toward the surface effects of underground coal mining operations, and embodying the following requirements. In adopting any rules and regulations, the regulatory authority shall consider all distinct differences between surface coal mining and underground coal mining. (b) Each permit issued pursuant to this article and relating to underground coal mining shall require the operator to: (1) Adopt measures consistent with available technology in order to prevent subsidence causing material damage to the extent technologically and economically feasible, maximize mine stability, and maintain the value and reasonably foreseeable use of such surface lands, except in those instances where the mining methods used requires planned subsidence in a predictable and controlled manner. Nothing in this subsection shall be construed to prohibit...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-91.htm - 10K - Match Info - Similar pages
9-16-90
Section 9-16-90 Environmental protection performance standards. (a) Any permit issued pursuant to this article to conduct surface mining operations shall require that such surface coal mining operations will meet all applicable performance standards of this article, and such other requirements as the regulatory authority shall promulgate. (b) General performance standards shall be applicable to all surface coal mining and reclamation operations and shall require the operation as a minimum to: (1) Conduct surface coal mining operations so as to maximize the utilization and conservation of the solid fuel resource being recovered so that reaffecting the land in the future through surface coal mining can be minimized; (2) Restore the land affected to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or better uses of which there is reasonable likelihood, so long as such use or uses do not present any actual or probable hazard to...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-90.htm - 30K - Match Info - Similar pages
25-9-134
Section 25-9-134 Blasting practices and procedures generally. (a) Only competent persons shall be designated or permitted to handle explosives or do blasting. Only electric detonators of proper strength may be used and the use of delay electric detonators is prohibited for blasting coal or coal and other material. Primers shall be made up as needed for blasting and prepared in accordance with the safety standards of the Institute of Makers of Explosives or of the manufacturer of the explosives as approved by the chief; provided, however, that nothing provided in this subsection shall prohibit the use of permissible millisecond blasting in conformity with the requirements, exceptions, limitations, conditions, and restrictions on the use thereof established or hereinafter established by the Bureau of Mines of the United States Department of the Interior. (b) Care shall be used in placement and drilling of holes. Test roof, face, ribs and timbers for dangerous conditions before drilling...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/25-9-134.htm - 6K - Match Info - Similar pages
25-9-300
Section 25-9-300 Map of mine - Required; contents; filing; examination, etc. The owner, operator, or lessee of any underground coal mine in this state shall make or cause to be made by a competent engineer an accurate and exact detail map of said mine, showing the exact position of said mine in reference to the section line, which shall be connected with known boundary lines of the section or subdivision of the section. Such map shall show accurately the position of any branches, creeks, rivers, railroads, oil and gas pipelines under which said mine workings extend and, as near as possible, the position of any coal mines nearby. The location of all oil and gas wells shall be shown on said map. Said maps shall show all shafts, slopes, tunnels, or other openings to the surface or to the workings of a contiguous coal mine; all excavations, entries, rooms, and crosscuts; the location of the fan and the direction of the air currents; the location of pumps, hauling engines, engine planes,...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/25-9-300.htm - 3K - Match Info - Similar pages
9-16-2
Section 9-16-2 Definitions. Unless clearly indicated otherwise by the context, as used in this article, the following terms have the following meanings: (1) AFFECTED LAND. The area of land from which overburden has been removed or upon which overburden has been deposited after October 1, 1970. (2) CONTEMPORANEOUS. Occurring at the same time as a surface mining operation and in conjunction with the grading activities at the site. (3) CONTIGUOUS. In actual contact, touching, as contrasted with being near but not in contact. (4) DEPARTMENT. The Department of Industrial Relations of the State of Alabama or any department, bureau, or commission as may lawfully succeed to the powers and duties of the department relating to mining operations. (5) DIRECT SEEDING. The planting of seeds by hand sowing, machine sowing, or aerial seeding. (6) DIRECTOR. Director of the department or officer, bureau, or commission as may lawfully succeed to the powers and duties of the director. (7) HIGHWALL. The...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-2.htm - 3K - Match Info - Similar pages
9-16-83
Section 9-16-83 Permits - Contents of application; reclamation plan; copy of application filed for public inspection; insurance; blasting plan. (a) Each application for a surface coal mining reclamation permit under this article shall be accompanied by a fee as determined by the regulatory authority, but not to exceed the anticipated cost of reviewing, administering, and enforcing the permit. In no event shall the permit fee be less than one thousand dollars ($1,000). The regulatory authority shall develop procedures to enable the cost of the fee to be paid over the life of the mine. The life of the mine means the term of the permit and the time required to successfully complete all surface coal mining and reclamation activities and obtain a full release of the performance bond for each bonded area. (b) The permit application shall be submitted in a format prescribed by and satisfactory to the regulatory authority and shall contain, among other things, all of the following: (1) The...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-83.htm - 13K - Match Info - Similar pages
22-3-5
Section 22-3-5 County health officers - Duties generally. It shall be the duty of the county health officer: (1) To exercise, subject to the advice of the county board of health in accordance with the health laws of the state, general supervision over the sanitary interests of the county; and, should he discover any cause of disease or the existence of any condition detrimental to the health of the people, he shall, so far as authorized by law, compel the removal or abatement of the same; and, should no authority for removal or abatement exist, he shall report the fact to the county board of health, adding such recommendations as to special action as he may deem proper; (2) To make personal and thorough investigation of the first case or early cases of any diseases suspected of being or known to be any one of those enumerated in Chapter 11 of this title that may come to his knowledge or be reported to him; and, should he decide such case or cases to be one of those enumerated in said...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/22-3-5.htm - 8K - Match Info - Similar pages
9-16-89
Section 9-16-89 Performance bonds and bond releases. (a) After a surface coal mining and reclamation permit application has been approved but before such a permit is issued, the applicant shall file with the regulatory authority, on a form prescribed and furnished by the regulatory authority, a bond for performance payable to the state and conditioned upon faithful performance of all the requirements of this article and the permit. The bond shall cover all lands disturbed by the surface coal mining operation and the amount of the initial bond shall be such to cover that area of land within the permit area upon which the operator will initiate and conduct surface coal mining and reclamation operations within the initial term of the permit. As succeeding increments of surface coal mining and reclamation operations are to be initiated and conducted within the permit area, the permittee shall file with the regulatory authority an additional bond or bonds to cover such increments in...
alisondb.legislature.state.al.us/alison/CodeOfAlabama/1975/9-16-89.htm - 10K - Match Info - Similar pages
|